Laserfiche WebLink
<br />Atlantic Isles Roadway and Utility Improvements <br /> <br />Bid <br />Item <br /> <br />Description <br /> <br />Estimated <br />Quantity Unit <br /> <br />Unit Price <br /> <br />Estimated Total <br /> <br />F Lift Station <br /> 49 Complete as per plans to include but not limited <br /> to labor. equipment. materials, electric. <br /> mechanical. earthwork. etc LS $160,000.00 $ 160,000.00 <br />G Pavement Marking, Striping and Signage <br /> 50 18" yellow solid line 76 LF $ 3.80 $ 288,80 <br /> 51 18" white solid line 290 LF $3.80 $1,102.00 <br /> 52 24" stop bar 18 LF $ "i 00 $ 90.00 <br /> 53 6" double yellow 122 LF $ 1 40 $ 1 70 RO <br /> 54 8" white 10'-30' skip 0,50 GM $ 3 800 on $ 1 gOO 00 <br /> , , <br /> 55 8" white solid line 351 LF $ 070 $ 245,70 <br /> 56 RPM amber/amber 85 EA $ R "i0 $ 722.50 <br /> 5 7 RPM blue/blue 6 EA $ 850 $ 51.00 <br /> 58 R5- 1 (Do Not Enter) 3 EA $ 240.00 $ 720.00 <br /> 59 R6- 1 L (One Way) 1 EA $ 240.00 $ 240.00 <br /> 60 R6-1 R (One Way) 3 EA $ 740.00 $ 720.00 <br /> 61 R3- 1 (No Right Turn) 1 EA $ 240.00 $ 240.00 <br /> 62 Rl -2 (Yield) 1 EA $ 240.00 $ 240,00 <br /> Subtotal-Civil $ 1,519,539.70 <br />III, Electrical - Street Lighting <br /> 63 Furnish and install decorative light pole cost 33 EA $ 7.674.65 $253.263.45 <br /> 64 Furnish and install decorative light fixture cost 33 EA $4,364.54 $144,029.82 <br /> 65 Wiring of light fixtures 33 EA $ 340.78 $11,245.74 <br /> 66 Copper wiring (As per Plans) 16.000 LF $ 3.22 $ 51,520.00 <br /> 67 Furnish and install 2" schedule 40 PVC conduit to <br /> include trenching (6" x 12" deep), backfill and <br /> restoration 4,000 LF $ 6,81 $ /7 740 00 <br /> 68 Handholes 33 EA $ 2.122.05 $ 70.027.65 <br /> 69 Copper clad ground rods (5/8" dia x 10'L) 33 EA $ 89.95 $ 2.968.35 <br /> 70 Panel & Meter Enclosure. including connection to <br /> service Doint LS $ 23,000.00 $ 23,000.00 <br /> Subtotal-Electrical $583,295.01 <br />IV. North Miami Beach Water Main Installation <br /> 71 Mobilization. General Conditions 10nly for items in <br /> IV Installation of Water Main System) LS $10,000,00 $10,000.00 <br /> 72 Abandonment / Removal of Existing Water <br /> System 1 LS $ 6.750,00 $ 6,750.00 <br /> 73 Install 8" PVC Pipe C-900 2,560 LF $ 28.00 $ 71.680.00 <br /> 74 Install 6" PVC Pipe C-900 420 LF $ 18,00 $ 7,560.00 <br /> 75 Install 4" Polyethylene Casing Pipe 85 LF $ 12,00 $ 1,020.00 <br /> 76 Install 2" Polyethylene Casing Pipe 770 LF $ 5.00 $ 3,850.00 <br /> 77 c;:c;: itra~~ 1U I:A ~ LbU.UU ~ L,bUU.UU <br /> 78 Install Fire Hydrants 6 EA $ 2.500.00 $ 15 000 00 <br />05/0B-Addendum No, 5 00300-4 05-4893 <br />