My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EDAW, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
EDAW, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:58 PM
Creation date
8/14/2008 4:44:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />i. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br />L-- <br /> <br /> <br />Home Park Master Plan, Streetscape <br />Visioning Before and After - Atlanta, GA <br /> <br />COLLINS AVENUE STREETSCAPE DESIGN SERVICES 115 <br /> <br />. Specifications and bid documents manual. <br /> <br />CONSTRUCTION ADMINISTRATION SERVICES <br /> <br />To ensure that the construction is performed in accordance with the drawings <br />and specifications, we will complete the following construction administration I <br />observation services: <br /> <br />Construction Administration: <br /> <br />. Attend a pre-bid meeting <br /> <br />. Review and analyze the bids with the Client I project manager and <br />make recommendation for contractor selection <br /> <br />. Attend a pre-construction meeting <br /> <br />. Shop drawing review and approval and as-built drawing review <br />prepared by other, noting any known discrepancies. <br /> <br />. Issue clarifications for RFI's <br /> <br />. Up to two (2) trips to tree farms to perform tagging of trees for the <br />project. <br /> <br />. Review and approve pay application requests. <br /> <br />. Provide construction observation site visits (18 included in fixed fee <br />for basic services). Within five (5) business days of site visit, EDAW <br />will provide a written report. EDAW shall include in report deviations <br />of the work from the contract documents observed as part of such site <br />visit. EDAW's obligation, pursuant to this sub-paragraph shall be <br />subject to applicable standards of professional care and site <br />conditions prevailing at the time of the visit and said site conditions <br />shall be in the written report. <br /> <br />. Review final punch list with Client and contractor. <br /> <br />SCHEDULE <br />We've provided a draft timeline for your reference. We welcome the <br />opportunity to review it with the City for any suggestions, critical dates, <br />coordination issues and recommended changes. <br /> <br />Consultant Selection ................................................... October 2007 <br />Contracting and project initiation ................................. November 2007 <br />Survey......................................................................... February 2008 <br />Concept development and Public meeting .................. March 2008 <br />Schematic design ........................................................ April 2008 <br />Design Development ................................................... May 2008 <br />Construction Documents ............................................. August 2008 <br />Construction ................................................................ TBD <br /> <br />EDAW INe DESIGN, PLANNING AND ENVIRONMENTS WORLDWIDE <br />
The URL can be used to link to this page
Your browser does not support the video tag.