<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />
<br />Shahin Hekmat, P. E.
<br />
<br />Project Manager
<br />
<br />15. FIRM NAME AND LOCATION (Cltvand State)
<br />Eisman & Russo, Inc. (Davie, FL)
<br />
<br />16 EDUCATION (DEGREE AND SPECIALlZA nON)
<br />B.S., Civil Engineering, University of Miami, Coral Gables
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer, Florida #49941
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Oroanizations, Trainino, Awards. etc.!
<br />. FES/FICE Leadership Institute - 2006 . Advanced Work Zone Traffic Control
<br />. FES Stormwater Management Design . Florida Engineering Society
<br />. FDEP NPDES Design Course . FICE CLEC
<br />
<br />, t#<i"!~~~~;\~"1~'i. m-~l::l.:t"~mrlim.lIl::{.u.'1
<br />
<br />11\ TITI F ANn I Or.ATION I(;ilv ;,nrf -"'(;'(AI
<br />Consulting Engineering Services
<br />(Various Municipalities in South Florida)
<br />
<br />. Nat'l Society of Professional Engineers
<br />. FL Assoc. of Special District Engineers
<br />. American Water Works Association
<br />
<br />
<br />~/.~ ';;~-,J.i',
<br />
<br />1990-2007
<br />
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.! AND SPECIFIC ROLE 0 Check if proiect performed with current firm
<br />erved as City Engineer for City of Weston, Consultant Engineer for the City of Sunny Isles Beach and North Lauderdale and
<br />District Consultant for South Broward Drainage District, Indian Trace Development District, Bonaventure Development District
<br />nd North Lauderdale Water Control District.
<br />
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2003-2007 N/A
<br />
<br />(1) TITLE AND LOCATION (Cltv and State)
<br />172nd Avenue Roadway Improvements, from Collins Ave, to North Bay Road
<br />
<br />(Sunny Isles Beach, FL)
<br />
<br />b.
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 0 Check if proiect performed with current finn
<br />Project included resurfacing of 1,400 LF of 2 lane road, redesign of entire drainage system with type F curb and gutter, new
<br />sidewalk and Landscaping. Required coordination with WASD to allow rehabilitation of existing sanitary sewer collection
<br />system. Under grounding of FPL overhead lines and design of new street lighting. Permitting, bid, bid analysis and award were
<br />also included in the project scope. Under Design
<br />
<br />(1) TITLE AND LOCATION (Citv and State)
<br />Atlantic Avenue Improvements
<br />(Sunny Isles Beach, FL)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2003-2007 N/A
<br />
<br />c.
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 0 Check if proiect performed with current finn
<br />Engineering Design Services for the Sanitary Sewer Collection System and Lift Station Design per Miami-Dade County Water
<br />and Sewer Department, Drainage Improvements, Widening of Existing 2 Lane Road and Resurfacing, Coordinate the under
<br />grounding of existing overhead FPL lines and replacing existing Street lighting with new Decorative Poles, Permitting, Bid,
<br />Award and Construction oversight for the Atlantic Avenue Special Assessment District. Under Design
<br />
<br />(1) TITLE AND LOCATION (Citv and State)
<br />Three Village and Country Isles Roadway Improvements
<br />(City of Weston, FL)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2004-2007 2007
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 0 Check if proiect performed with current finn
<br />d. Addition of a 6' bike lane to both side of Three Village and Country Isles Road, Addition parallel Parking and alignment
<br />modification along Country Isles Road to improve safety and circulation, Removal of existing swale, providing curb and gutter
<br />and Drainage retrofit, New Sidewalks and Brick Paver crosswalks, Utility Relocation and Replacement, Landscape adjustment
<br />and resurfacing of both street. Permitting, Bid, Award and construction management and oversight. $1,000,000 Construction
<br />Cost
<br />
<br />(1) TITLE AND LOCATION (Citvand State)
<br />Bonaventure Master Plan
<br />(Bonaventure, FL)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2000-2004 2001-2006
<br />
<br />e.
<br />
<br />(3) BRIEF DESCRIPTION (Brief SCODe. size. cost. etc. I AND SPECIFIC ROLE 0 Check if oro;ect oerformed with current finn
<br />Project was designed Bid and constructed in four different Phases and consisted of about 10 miles of roadway improvement
<br />and Landscape Upgrade including Drainage Retrofit and Upgrade, Roadway Realignment and Median Construction, Landscape
<br />Design, Sidewalk Reconstruction, Brick Paver Crosswalks and Resurfacing of the Roadways. $4,500,000 Construction Cost
<br />
<br />STANDARD FORM 330 (612004) PAGE #
<br />
|