<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />
<br />Scott Gombar, P. E.
<br />
<br />Principal-In-Charge
<br />
<br />15, FIRM NAME AND LOCATION (Citvand State)
<br />Eisman & Russo, Inc. (Davie, FL)
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S., Mechanical Engineering, Manhattan College
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer, Florida
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Omanizations, Trainino, Awards, etc.!
<br />. CTQP Final Estimates, Level 2 . FDOT Prestressed Concrete
<br />
<br />. CTQP Pile Driving . CTQP Drilled Shaft
<br />
<br />. ATISA MOT Traffic Control Supervisor . CTQP QC Manager
<br />
<br />. Troxler Nuclear Density Gauge
<br />. NPDES Training
<br />. CTQP Asphalt Paving, Levels 1 & 2
<br />,~'t;1 -~ ~f
<br />
<br />
<br />~~ -<..
<br />
<br />'~~~~~~.~t,':'"
<br />
<br />
<br />11\ TITI F ANn I Or.ATION Ir.itv ~nrf St~t,,)
<br />Sunny Isles Beach Capital Improvements
<br />(Sunny Isles Beach, FL)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.! AND SPECIFIC ROLE 5'1 Check if proiect performed with current tirm
<br />a. Managed $36M capital improvement program, including FP&L utility relocations, seawall replacement, new city hall
<br />overnmental facility, new active park facility, pedestrian bridge study, roadway reconstruction and traffic calming, decorative
<br />treet lighting installation, new parking lot construction, landscaping improvements, resident-only parking facilities, drainage
<br />improvements, and bridge rehabilitation.
<br />
<br />(1) TITLE AND LOCATION (Cltv and State)
<br />1-75 Grouping
<br />(Broward County, FL)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Est. 2008
<br />
<br />b.
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.! AND SPECIFIC ROLE 0 Check if proiect performed with current firm
<br />Senior Project Engineer. Project consists of two bridges, one 19 span low level and one single span prestressed box slab unit
<br />bridge as part of the new exit slip ramp from 1-75 to WB Weston Rd., milling and resurfacing of 1-75 from Sheridan St. to the
<br />Sawgrass Interchange and highway lighting for the Sawgrass Interchange. Other elements of this project include temporary
<br />and permanent MSE walls, prestressed pile bridge foundation, temporary roadway construction, drainage modification and
<br />environmental monitoring.
<br />
<br />(1) TITLE AND LOCATION (Citv and State)
<br />Eller Drive
<br />(Broward County, FL)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2007 2007
<br />
<br />c.
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE 0 Check if proiect performed With current firm
<br />Senior Project Engineer. Project consists of the construction of a loop ramp and two bridges connecting Port Everglades to the
<br />Fort Lauderdale International Airport. Construction activities include MSE wall construction, high-mast lighting, earthwork, and
<br />drainage and bridge construction. Project is on track to be completed 5 months ahead of schedule and within budget.
<br />
<br />(1) TITLE AND LOCATION (Citv and State)
<br />1-95 Resurfacing (from Miami-Dade Co. Line to Dania Beach Cut-Gff Canal
<br />(Broward County, FL)
<br />
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE 0 Check if proiect performed with current firm
<br />d. Senior Project Engineer. Performed CEI services for 6.2 miles of 1-95. Existing roadway consisted of 10-lane divided highway
<br />and single-lane on- and off-ramps at six interchanges. Proposed improvements included resurfacing of mainline pavement,
<br />ramps, and crossroads at Hallandale Beach Blvd., Pembroke Rd., Hollywood Blvd., Stirling Rd., Sheridan St., and Griffin Rd.,
<br />together with signalization, reworking shoulders, guardrail replacement, desilting of drainage structures, and landscaping on 1-
<br />95, with new sidewalks and landscaping at the interchanges.
<br />
<br />(1) TITLE AND LOCATION ICitv and State)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION IIf applicable)
<br />
<br />(3) BRIEF DESCRIPTION IBrief scooe. size. cost etc. J AND SPECIFIC ROLE
<br />
<br />o Check if oroiect oerformed with current firm
<br />
<br />e.
<br />
<br />STANDARD FORM 330 (612004) PAGE #
<br />
|