<br />Brett Pielstick, P. E.
<br />
<br />QA/QC Manager
<br />
<br />15, EIRM NAME AND LOCATION ICitvand State)
<br />
<br />Eisman & Russo, Inc. (Jacksonville, FL)
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S., Civil Engineering, Brigham Young University
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION ISTATE AND DISCIPLINE)
<br />Professional Engineer, Florida, Georgia, California, South Carolina
<br />
<br />and Virginia
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS IPublications, Oroanizations, Trainino, Awards. etc.!
<br />· ASBI Grouting Certification . Bridge and Foundation Inspection
<br />
<br />· CTQP QC Manager . FOOT Preparation of Final Estimates
<br />
<br />. Advanced MOT . Contract Admin and Concrete
<br />
<br />· CPM Scheduling for Project Engineer's
<br />. FOOT Lead Base Paint on Bridges
<br />. Claims Negotiations
<br />
<br />[ ,;:1<. ~.~a~~,,:i;':" t: ,.,~,~!? . 'j';,f Iii' . . . ..'::1''''''''4 i. .~"~~;:>" '>;'''''"'''''-'''' ~:;t"'" <, ~'. 1
<br />-~ ~; ',oj ,~,r~1' -..~ .,,- (:':~q::~. '-'i:-";.:<. "..-i'~}~_,_' -'r",~:~"\ c" .{.';'~;f.~:"'7" :7_~
<br /> 11\ TITI F ANn I O(:ATION {(:itv~nrl St~tF!1
<br /> SR 170 New Interchange with Florida Turnpike PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable)
<br /> (Palm Beach County, FL) 2006 2006
<br /> (3) BRIEF DESCRIPTION IBrief scope, size. cost, etc,) AND SPECIFIC ROLE o Check if proiect performed with current firm
<br />a. Providing CEI services for new interchange construction with the Mainline Turnpike (Mile Post 106), including SuperPave
<br /> asphalt pavement, milling and resurfacing, barrier wall, guardrail, roadside signs, roadway lighting, fencing, drainage ponds,
<br /> bridge overpass structure, sound wall, MSE walls, cast-in-place barrier with infrastructure screen wall, toll equipment building,
<br /> oncrete toll plaza pavement, "Sunpass Only" toll gantry structures, signalization, and landscaping.: Construction Cost-
<br /> $16,320,000.
<br /> (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED
<br /> 1-95/9A/1-295 Interchange PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> (Duval County, FL) 2005 2005
<br /> (3) BRIEF DESCRIPTION IBriefscope, SIZe, cost. etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm
<br />b. Senior Project Engineer for the construction of $100M interchange, as well as three additional segments of 9A to complete the
<br /> belt loop around Jacksonville, Florida. Work included a multi-level interchange with 3 segmental flyovers, totaling over 850
<br /> segments, and millions of cubic meters of borrow and excavation, as well as box culverts construction, standard bridges, and
<br /> asphalt and concrete paving.
<br /> (1) TITLE AND LOCATION ICltv and State) 12\ YEAR COMPLETED
<br /> US 90 and US 17 Bridge Replacements PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> (Duval County, FL) 2001 2001
<br /> (3) BRIEF DESCRIPTION IBrief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if proiect performeo With current firm
<br />c. Senior Project Engineer for the replacement of 11 bridges along US90 and US 17 in the greater Jacksonville area, including
<br /> flat slab, box culvert and AASHTO beams bridge types. The project had multiple contractors and letting dates.
<br /> (1) TITLE AND LOCATION ICltv and State) 12\ YEAR COMPLETED
<br /> Broadway Bridge Replacement PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> (Vol usia County, FL) 2002 2002
<br /> (3) BRIEF DESCRIPTION IBrief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm
<br />d. Resident Eng. for construction of New Broadway Bridge in downtown Daytona Beach, with twin precast segmental bridges built
<br /> by balanced cantilever method. Each bridge has spans up to 80 meters with horizontal and vertical curves throughout project,
<br /> which consists of a high-profile signature bridge with many architectural features including mosaic tiles on piers and railing.
<br /> (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> (3) BRIEF DESCRIPTION IBrief SCODe, size. cost. etc,) AND SPECIFIC ROLE o Check if oroiect oerformed With current firm
<br />e.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE #