Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />Jennifer C. Lewis, P. E. <br /> <br />Contract Plans/Special Provisions <br /> <br />15, FIRM NAME AND LOCATION (Citvand State) <br /> <br />Eisman & Russo, Inc. (Jacksonville, FL) <br /> <br />16, EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineering, University of Central Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer, Florida #54048 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Oroanizations, Trainino, Awards, etc.) <br />. FDOT LRE . Advanced MOT <br /> <br />. FOOT PEDDS . ASCE Member <br /> <br />. FDOT Transport System . WTS Programs Co-Chair <br /> <br />. FICE Member <br />. Microsoft Project <br /> <br />l '>i'm~'l~" , ;;. ",-~ . . . ..iB' , "( ,J,.~ ;i;.~ti&~ii, ., 1 <br />c'( '!o""~ ~ ,: ~,.~t\ ;Ji' -"'-~,,-L"I:'-r ,; <br />~'}r',ii!"!;' "-'~,-:r_l"7:W . , <br /> (1) TITI F ANn I nr.ATlnN rr.ilVRnrl SIRlp' <br /> SR 60jYeehaw Junction and Florida's Turnpike PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> (Osceola County, FL) Sept. 2007 Currently under Const. <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE Ii'! Check if proiect performed with current firm <br />a. Mrs. Lewis served as the Project Manager. Project consists of intersection improvements at Entrance/Exit Ramps at Yeehaw <br /> ~unction, including the construction of right turn lanes in NB and SB directions, milling and resurfacing, re-striping, and <br /> ~onstruction of traffic sepa rator. Plans also included signing and pavement marking and lighting plans. Cost estimates and <br /> Ispecifications were done according to FDOT standards. Construction cost of $500,000. <br /> (1) TITLE AND LOCATION (Citv and State) 12' YEAR COMPLETED <br /> We kiva Springs Road PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> (Seminole County, FL) Sept. 2005 Currently under Const. <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.! AND SPECIFIC ROLE o Check if praieet performed with current firm <br />b. Mrs. Lewis served as the Project Manager. Project consisted of increasing the operational and safety characteristics of Wekiva <br /> Springs Road between Sabal Palm Drive/Cutler Road and Wekiva Springs Lane, approx.1.2 miles long. Project improvements <br /> included lane configuration improvement near major intersections, wider medians, and pavement rehabilitation, cross <br /> slope/superelevation correction, stormwater improvements, design of mast arm signals at two locations, modification to signal <br /> timings, and utility identification and improvements. Construction cost of $6,500,000. <br /> (1) TITLE AND LOCATION (Citvand State) 12' YEAR COMPLETED <br /> 1-75 @ SR 82 Design Build PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> (Lee county, FL) August 2004 September 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if proiect performed With current firm <br />C. Mrs. Lewis served as Project Manager. Project consisted of milling, resurfacing, and widening of existing northbound and <br /> southbound off-ramps. Responsible for design effort and completed plans within 4 months. Improvements included the <br /> addition of paved shoulders, evaluating side slopes for FDOT compliancy, minor drainage modifications and construction of <br /> new mast arms at SR 82. Construction cost of $1,500,000. <br /> (1) TITLE AND LOCATION (Citv and State) 12' YEAR CflMPLETED <br /> SR 10 (US 90) PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> (Jackson County, FL) November 2004 April 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.! AND SPECIFIC ROLE o C heck if proiect performed with current fi rm <br />d. Mrs. Lewis served as Project Manager. Provided milling and resurfacing on 3 miles of an existing two-lane typical. <br /> Improvements included the addition of 5' paved shoulders, intersection improvements, evaluating side slopes for FDOT <br /> compliancy, and minor drainage modifications. Construction cost of $3,500,000. <br /> (1) TITLE AND LOCATION (Cltv and State) 12' YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc. I AND SPECIFIC ROLE o Check if proiect performed with current firm <br />e. <br /> <br />STANDARD FORM 330 (6/2004) PAGE # <br />