<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />
<br />Jennifer C. Lewis, P. E.
<br />
<br />Contract Plans/Special Provisions
<br />
<br />15, FIRM NAME AND LOCATION (Citvand State)
<br />
<br />Eisman & Russo, Inc. (Jacksonville, FL)
<br />
<br />16, EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S., Civil Engineering, University of Central Florida
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer, Florida #54048
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Oroanizations, Trainino, Awards, etc.)
<br />. FDOT LRE . Advanced MOT
<br />
<br />. FOOT PEDDS . ASCE Member
<br />
<br />. FDOT Transport System . WTS Programs Co-Chair
<br />
<br />. FICE Member
<br />. Microsoft Project
<br />
<br />l '>i'm~'l~" , ;;. ",-~ . . . ..iB' , "( ,J,.~ ;i;.~ti&~ii, ., 1
<br />c'( '!o""~ ~ ,: ~,.~t\ ;Ji' -"'-~,,-L"I:'-r ,;
<br />~'}r',ii!"!;' "-'~,-:r_l"7:W . ,
<br /> (1) TITI F ANn I nr.ATlnN rr.ilVRnrl SIRlp'
<br /> SR 60jYeehaw Junction and Florida's Turnpike PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> (Osceola County, FL) Sept. 2007 Currently under Const.
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE Ii'! Check if proiect performed with current firm
<br />a. Mrs. Lewis served as the Project Manager. Project consists of intersection improvements at Entrance/Exit Ramps at Yeehaw
<br /> ~unction, including the construction of right turn lanes in NB and SB directions, milling and resurfacing, re-striping, and
<br /> ~onstruction of traffic sepa rator. Plans also included signing and pavement marking and lighting plans. Cost estimates and
<br /> Ispecifications were done according to FDOT standards. Construction cost of $500,000.
<br /> (1) TITLE AND LOCATION (Citv and State) 12' YEAR COMPLETED
<br /> We kiva Springs Road PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> (Seminole County, FL) Sept. 2005 Currently under Const.
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.! AND SPECIFIC ROLE o Check if praieet performed with current firm
<br />b. Mrs. Lewis served as the Project Manager. Project consisted of increasing the operational and safety characteristics of Wekiva
<br /> Springs Road between Sabal Palm Drive/Cutler Road and Wekiva Springs Lane, approx.1.2 miles long. Project improvements
<br /> included lane configuration improvement near major intersections, wider medians, and pavement rehabilitation, cross
<br /> slope/superelevation correction, stormwater improvements, design of mast arm signals at two locations, modification to signal
<br /> timings, and utility identification and improvements. Construction cost of $6,500,000.
<br /> (1) TITLE AND LOCATION (Citvand State) 12' YEAR COMPLETED
<br /> 1-75 @ SR 82 Design Build PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> (Lee county, FL) August 2004 September 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if proiect performed With current firm
<br />C. Mrs. Lewis served as Project Manager. Project consisted of milling, resurfacing, and widening of existing northbound and
<br /> southbound off-ramps. Responsible for design effort and completed plans within 4 months. Improvements included the
<br /> addition of paved shoulders, evaluating side slopes for FDOT compliancy, minor drainage modifications and construction of
<br /> new mast arms at SR 82. Construction cost of $1,500,000.
<br /> (1) TITLE AND LOCATION (Citv and State) 12' YEAR CflMPLETED
<br /> SR 10 (US 90) PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> (Jackson County, FL) November 2004 April 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.! AND SPECIFIC ROLE o C heck if proiect performed with current fi rm
<br />d. Mrs. Lewis served as Project Manager. Provided milling and resurfacing on 3 miles of an existing two-lane typical.
<br /> Improvements included the addition of 5' paved shoulders, intersection improvements, evaluating side slopes for FDOT
<br /> compliancy, and minor drainage modifications. Construction cost of $3,500,000.
<br /> (1) TITLE AND LOCATION (Cltv and State) 12' YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc. I AND SPECIFIC ROLE o Check if proiect performed with current firm
<br />e.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE #
<br />
|