Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />Humberto Castillero, P. E. <br /> <br />Contract Plans/Special Provisions <br /> <br />a. TOTAL <br />18 <br /> <br />15. FIRM NAME AND LOCATION ICitvand State) <br /> <br />Eisman & Russo, Inc. (Jacksonville, FL) <br /> <br />16. EDUCATION !DEGREE AND SPECIALlZA nON) <br />M.B.A., Indiana University <br />B.S., Civil Engineering, Clarkson <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION ISTA TE AND DISCIPLINE) <br />Professional Engineer, Florida and California <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS IPublications, Oroanizations. Trainino, Awards. etc) <br />. ITS Systems Certificate . FOOT Laws & Rules Seminar <br /> <br />. FOOT Advanced Work Zone Traffic Ctrl . FOOT Excellence/Quality in Project <br /> <br />. FDOT Design Training Update Management <br /> <br />l ,~;.::r~"'B~f~~:t'i"';' 7&:~~,'t ~'4"\;"t11'nl:~::I.:::ll'~mq;l:~.~::('tI~" . ~r;"VZ'" "~fo,:);;;;' ".,.. J <br />. ;"-;:.<1_ ' r~'..~, .-'_r. !. .'i -,,'-'''' :!:..~ ";~ '" . <br /> '1\ TITI F ANn I Or.ATION Ir.itv Anrl StA/pl <br /> 1-75/SR 93 Milling and Resurfacing from Alachua County to SR 47 Interchange PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) <br /> (Hamilton County, FL) 2006 N/A <br /> (3) BRIEF DESCRIPTION IBrief scope, size, cost. etc) AND SPECIFIC ROLE o Check if proiect performed with current firm <br />a. Provided highway construction plans for milling and resurfacing and cross slope adjustment of outside lanes from 2% to 3%. <br /> Design activities include pavement design cross sections, typical sections, plans, signing and pavement markings and <br /> maintenance of traffic plans. First section included 9.8 miles of roadway; second section was 5.1 miles. Total Approximate <br /> Construction Cost- $28,000,000. <br /> (1) TITLE AND LOCATION ICitv and State) (2) YEAR COMPLETED <br /> Ricker Road from Morse Avenue to Old Middleburg Road PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) <br /> (Jacksonville, FL) 2005 2005 <br /> (3) BRIEF DESCRIPTION IBrief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm <br />b. Better Jacksonville Plan: Project Manager. Providing civil engineering design services for widening of 2.9 miles from two-lane <br /> rural roadway to three-lane urban section, including curb and gutter, sidewalks, bike lanes, lighting, traffic signal installation, <br /> storm water management improvements, signing and pavement markings, and utility relocation. <br /> (1) TITLE AND LOCATION ICitv and State) 12\ YEAR COMPLETED <br /> Lenox Avenue from Lane Avenue to Ellis Road PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) <br /> (Jacksonville, FL) 2005 2005 <br /> (3) BRIEF DESCRIPTION IBrief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if proiect performed with current firm <br />C. Better Jacksonville Plan: Project Manager. Providing civil engineering design services for widening from a two-lane rural <br /> roadway to a three-lane urban section, including curb and gutter, sidewalk, bike lanes, drainage, signing and marking. <br /> (1) TITLE AND LOCATION ICttvand State) 12\ YEAR COMPLETED <br /> J. Turner Butler Widening PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) <br /> (Jacksonville, FL) 2005 2005 <br /> (3) BRIEF DESCRIPTION IBrief scope, size. cost. etc,) AND SPECIFIC ROLE o Check if proiect performed with current firm <br />d. Jacksonville Transportation Authority: Project Manager. Provided civil engineering design services for widening of 3.2 miles of <br /> J. Turner Butler Boulevard from four to six lanes, as well as widening of five bridge structures. Work included design plans, <br /> stormwater facilities, signing/pavement marking, signal modifications, lighting, and post design services. <br /> (n TITLE AND LOCATION ICitv and State) '2\ YEAR COMPLETED <br /> Cecil Field Connector PROFESSIONAL SERVICES I CONSTRUCTION IIf applicable) <br /> (Jacksonville, FL) 2004 2004 <br /> (3\ BRIEF DESCRIPTION IBrief scooe. size. cost. etc.) AND SPECIFIC ROLE o Check if proiect performed with currenl firm <br />e. City of Jacksonville: Project Manager. Developed a preliminary design and environmental report to select the most cost <br /> effective alternative, producing an evaluation matrix for various costs, including roadway construction, R/Wacquisition, <br /> environmental impacts, utility installations, tree mitigation, etc. <br /> <br />STANDARD FORM 330 (6/2004) PAGE # <br />