Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />12. NAME <br />Robert J. Ross, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Sr. Civil Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />13 4 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Ross En ineerin , Inc., Coo er Cit , Florida <br />16, EDUCATION (DEGREE AND SPECIAUZA nON) <br />M,S. Civil Engineering, FlU, 2003 Water Resources <br />B,S. in Civil Engineering, FlU, 2000 <br />B.S. in Engineering Technology, University of Central Florida, 1994 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />FDEP Qualifed Storm water Inspector #5318; HEC RAS Model Training 1996,2000,2004; XP-SWMM Model Training 2002, 2004; ICPR Training 1997 <br />Water Environmental Federation Member <br />American Society of Civil Engineers Member <br />Florida Engineering Society Member I Florida Institute of Consulting Engineers Member Firm <br />19. RELEVANT PROJECTS <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPUNE) <br />Registered Professional Engineer, Florida #59485 <br /> <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> MDX Blue Lagoon Volumetric Analysis, Miami-Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> 2006-2007 <br />a (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l'8l Check if project performed with current firm <br /> Mr. Ross performed XP-SWMM flood control modeling and created a volumetric analysis report utilizing Miami-Dade County Department of Environmental <br /> Resource Management (DERM) C-4 models for the 5, 10, 25, 50 and 100 year events. The modeling report was then assembled to support a Miami-Dade <br /> County Expressway project, SR 836 (Dolphin) Ramp widening, to obtain an ERP permit with SFWMD, <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> South Florida Water Management District BCB Office, Stormwater Master Plan for PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> the Town of Immokalee, Florida 2004-2005 <br />b (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l'8l Check if project performed with current firm <br /> Mr. Ross is a deputy project manager to the Prime Consultant, HW Lochner. He is jointly responsible for Data collection; XP-SWMM water quantity and <br /> quality modeling (with groundwater recharge) for existing conditions and future land use alternatives for the 16 square mile town; conceptual design and <br /> permitting, <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> City of Doral Stormwater Master Plan, City of Doral, Florida (2005-2006) PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> 2005-2006 <br />c (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l'8l Check if project performed with current firm <br /> Deputy project manager and one of the key modelers on the project. Scope includes Data Collection, Existing Conditions continuous simulation <br /> modeling, calibration of 5, 10, 25 and 100 year storm events, Alternatives Modeling and Analysis, Altemative Designs, Conceptual design and <br /> permitting. <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> Central Broward Water Control District, District Engineer Contract PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> 2002-2003 <br />d (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Mr. Ross was the District Review Engineer working closely with the District Manager, Mike Crowley, and the District Engineer, Agustin Maristany. His duties <br /> included reviewing paving and drainage permits for private and public entities, coordinating with SFWMD and other municipalities, developing Flood Plain and <br /> other District Desiqn criteria includinq acceptable BMPs, and attendinq District Board meetinqs on occasion, <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> Miami-Dade County's Department of Environmental Resources Management PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> (DERM), Contract: DERM-04 Fema-Dorm" Miami, Florida, Task Order 1 2002-2003 <br />e (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Mr. Ross was the Lead Project Engineer for the drainage design of 3 unique square-mile sections of Miami-Dade County's Westchester area. Project was <br /> funded by FEMA due to major flooding in the area. Proposed drainage improvements included the design of exfiltration trench to meet the 5-year storm water <br /> quality criteria set forth by DERM and FEMA for local streets, Streets that were located on section lines and half-section lines were designed with <br /> interconnecting sub-basins spanning the length of the proiect and needed to meet 1 O-year storm water quality criteria set forth by DERM and FEMA, <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> Miami-Dade County's Department of Environmental Resources Management PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> (DERM), Contract: DERM-04 Fema-Dorm, Homestead, Florida. Task Order 2 06/02 to 12/02 03/03 to 07/03 <br />f (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Mr. Ross was the Lead Project Engineer for the design of 6,5 miles of canal dredging-sediment removal, embankment restoration and stabilization, and <br /> culverts. Project was funded by FEMA due to major flooding in the area. The North Canal is located in Homestead, Florida and provides flow between the <br /> Everglades and Biscayne Bay. Design followed FEMA, FHWA/FDOT, Miami-Dade County Public Works, and Miami-Dade County DERM procedures and <br /> desiqn standards. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MA~lnATnRY 11<::1= nATI= nl= I=nRM I;J?nn.1 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />