Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Civil QAlQC Manager <br /> <br />12. NAME <br />Fernando Miralles, PhD" P.E., D.E.E. <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />18 2. <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Ross En ineerin , Inc., Ft. Lauderdale, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science Mechanical Engineering, Ingeniero Mecanico, Universidad <br />Simon Bolivar, Caracas, Venezuela, 1987. <br />Master of Science Mechanical Engineering, University of California, Irvine CA, <br />1989. <br />Ph.D. Civil Engineering (Water Resources), MIT, Cambridge MA, 1992 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer 2000, Florida <br />Professional Engineer 1994, Massachusetts <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers <br />American Water Resources Association <br />National Science Foundation <br />US Department of State Expert Witness (Water Resources) <br />US AID Expert Witness (Water Resources) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED <br /> South Florida Water Management District BCB Office, Stormwater Master Plan for PROFESSIONAL SERVICES T CONSTRUCTION (if applicable) <br /> the Town of Immokalee, Florida 2004-2005 <br />a (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm <br /> In this capacity, Dr. Miralles is jointly responsible for stormwater modeling activities in support of a master plan for the South Florida Water Management <br /> District and Collier County, Florida, He jointly developed the Report for the assessment of existing stormwater management problems and the review of <br /> alternative strateqies to develop an economically and environmentally feasible stormwater master plan, <br /> (1) TITLE AND LOCATION (City and State) (31 YEAR COMPLETED <br /> Marshland Restoration Master Planning, Iraq United States Agency for International PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br />b Development - Task Order 1 06/04 - 12/04 <br />(4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm <br /> Site visit to southern Iraq (Basrah and Ahwar marshlands) in preparation for master plan effort funded by USAID. Preliminary report issued jointly with the <br /> Iraq Foundation and other NGOs in country. <br /> (1) TITLE AND LOCATION (City and State) 131 YEAR COMPLETED <br /> Watershed Modeling and Assessment, Panama Canal Authority, Panama as sub to PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> URS Corporation 02/02 to 11/02 <br />c (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Dr. Miralles served as chief hydrologist in charge of the development of water supply alternatives for expansion of the Panama Canal carrying capacity. <br /> These alternatives involved hydrologic analysis at the watershed level, including water budgets, surface and groundwater modeling and pollutant transport, <br /> (1) TITLE AND LOCATION (City and State) 131 YEAR COMPLETED <br /> Project Manager for Stormwater Managament Master Planning for the Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br />d Aviation Department (MDAD) in Miami, Florida <br />(4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> In this capacity, Dr. Miralles is responsible for planning and improvement to stormwater management systems at the Miami International Airport, Opa-Iocka <br /> General Aviation Airport and Kendall-Tamiami Executive Airport. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MA~lnATnRV 11<:1= nATI= nl= I=nR~A f;/?nn<1 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 3 <br />