|
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Civil QAlQC Manager
<br />
<br />12. NAME
<br />Fernando Miralles, PhD" P.E., D.E.E.
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL I b. WITH CURRENT FIRM
<br />18 2.
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Ross En ineerin , Inc., Ft. Lauderdale, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science Mechanical Engineering, Ingeniero Mecanico, Universidad
<br />Simon Bolivar, Caracas, Venezuela, 1987.
<br />Master of Science Mechanical Engineering, University of California, Irvine CA,
<br />1989.
<br />Ph.D. Civil Engineering (Water Resources), MIT, Cambridge MA, 1992
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer 2000, Florida
<br />Professional Engineer 1994, Massachusetts
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers
<br />American Water Resources Association
<br />National Science Foundation
<br />US Department of State Expert Witness (Water Resources)
<br />US AID Expert Witness (Water Resources)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (3) YEAR COMPLETED
<br /> South Florida Water Management District BCB Office, Stormwater Master Plan for PROFESSIONAL SERVICES T CONSTRUCTION (if applicable)
<br /> the Town of Immokalee, Florida 2004-2005
<br />a (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm
<br /> In this capacity, Dr. Miralles is jointly responsible for stormwater modeling activities in support of a master plan for the South Florida Water Management
<br /> District and Collier County, Florida, He jointly developed the Report for the assessment of existing stormwater management problems and the review of
<br /> alternative strateqies to develop an economically and environmentally feasible stormwater master plan,
<br /> (1) TITLE AND LOCATION (City and State) (31 YEAR COMPLETED
<br /> Marshland Restoration Master Planning, Iraq United States Agency for International PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br />b Development - Task Order 1 06/04 - 12/04
<br />(4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm
<br /> Site visit to southern Iraq (Basrah and Ahwar marshlands) in preparation for master plan effort funded by USAID. Preliminary report issued jointly with the
<br /> Iraq Foundation and other NGOs in country.
<br /> (1) TITLE AND LOCATION (City and State) 131 YEAR COMPLETED
<br /> Watershed Modeling and Assessment, Panama Canal Authority, Panama as sub to PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> URS Corporation 02/02 to 11/02
<br />c (4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Dr. Miralles served as chief hydrologist in charge of the development of water supply alternatives for expansion of the Panama Canal carrying capacity.
<br /> These alternatives involved hydrologic analysis at the watershed level, including water budgets, surface and groundwater modeling and pollutant transport,
<br /> (1) TITLE AND LOCATION (City and State) 131 YEAR COMPLETED
<br /> Project Manager for Stormwater Managament Master Planning for the Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br />d Aviation Department (MDAD) in Miami, Florida
<br />(4) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> In this capacity, Dr. Miralles is responsible for planning and improvement to stormwater management systems at the Miami International Airport, Opa-Iocka
<br /> General Aviation Airport and Kendall-Tamiami Executive Airport.
<br />
<br />AUTHORIZED FOR LOCAL REPRODUCTION
<br />MA~lnATnRV 11<:1= nATI= nl= I=nR~A f;/?nn<1
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 3
<br />
|