|
<br />II
<br />II
<br />12. NAME
<br />I Jorge Fernandez, II, PLS
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Weidener Surve in & Ma
<br />116. EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key oerson,)
<br />13. ROLE IN THIS CONTRACT
<br />Project Surveyor
<br />
<br />i I
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTA25 I b. Willi CURR~N6FIRM
<br />
<br />, P.A.
<br />
<br />10418 NW 31 Terrace Miami, Florida 331n
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />Considerable continuing education via workshops and enrollment at Florida Professional Surveyor and Mapper # 5103 (1992)
<br />I the Georgia Institute of Technology and the Southern Technical
<br />Institute.
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />I
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED
<br /> N.W. 74th Street Extension from SR-826 to SR-821/HEFT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami, Florida 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />a. Full design roadway project including horizontal and vertical control, sectional surveys, topographic surveys, DTM,
<br /> cross sections, bridge surveys, depiction of plats and delineation of the right of ways and parcel sketches for acquisition.
<br /> This 6 mile roadway project encompassed NW 74th Street from SR-836 to the HEFT, NW 58th Street from NW 107
<br /> Avenue to the HEFT, the HEFT from NW 58th Street to NW 74th Street and 7 major side streets. This project was
<br /> completed in March 2006 for a fee of $190,085. Mr. Fernandez was the surveyor in responsible charge of the project.
<br /> (1) TITLE AND LOCATION (City and State) mYEAR COMPLETED
<br /> SR-823 from Dade/Broward County line to S. of Pembroke Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Broward County, Florida 2005
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />Full design roadway project encompassing 3.56 miles for the Florida Department of Transportation District Four. The
<br /> project entailed HPNC, VPNC, alignment and/or existing right of way lines, aerial targets, topograpy, DTM, cross
<br /> sections and sectional surveys (7 sections) to establish the Historic Baseline of Survey. This project was completed in
<br /> November 2005 for a fee of$147,365. Mr. Fernandez was the Project Manager in responsible charge of the project.
<br /> (1) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED
<br /> SR-874 Northbound On Ramp PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami, Florida 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm
<br />c. Design survey services along SR-874 from SW 881h Street, crossing the Snapper Creek Canal to just southwest of SW
<br /> nod Street. WSM effort was to supplement previous control, alignment and photogrammetric mapping provided by
<br /> MDX. WSM provided field edit of obscured areas, supplemental topography, bridge surveys, staking and location of
<br /> borings, location of trees and delineation of the existing right of way. Project was completed in July 2005 for a fee of
<br /> $114,634. Mr. Fernandez was the Project Manager in responsible charge of the project.
<br /> (1) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED
<br /> Miami MetroMover, Omni Extention PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami, Florida 2002
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />d. WSM started working on this 1.5 mile elevated transit system throughout downtown Miami in August 1989. Full design
<br />surveys including HPNC, VPNC, route surveys, topographic surveys at all proposed stations and utility surveys were
<br /> provided. During construction WSM was employed by the construction manager to verify foundations, piers, pier caps,
<br /> plinths, running pads and guideways. In 2002, WSM has hired to provide boundary surveys of the entire system. Various
<br /> land lines were tied via survey ofthe City of Miami monument lines in the vicinity which were part of the original
<br /> control for the project. Total fee for the design and construction management was $515,200 and the boundary surveys
<br /> were $130,171. Mr. Fernandez was the surveyor in responsible charge of the proiect throughout all its phases.
<br />
<br />19 RELEVANT PROJECTS
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />I
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />AUTHORIZED FOR LOCAl REPRODUCTION
<br />I MANDATORY USE DATE OF FORM 612004
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|