|
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />
<br />12. NAME
<br />Kathryn O'Leary Richards, RLA, ASLA
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />23 6
<br />
<br />15. FIRM NAME AND LOCATION (City and Slate)
<br />O'Leary Richards Design Associates, Inc.
<br />
<br />16. EDUCATION (DEGREEANDSPECIAUZATION)
<br />Bachelor of Landscape Architecture
<br />University of Florida, 1985
<br />
<br />Miami, Florida
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida Landscape Architect #00001317
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.)
<br />Member of the American Society of Landscape Architects
<br />FNGLA Award of Excellence for Collins Avenue, Bal Harbour, Florida
<br />2005 Award for Best So. Florida Playground from Parenting Magazine, Evelyn Greer Park, Pinecrest, Florida
<br />
<br />
<br />(1) TITLE AND LOCATION (Cily and Slate)
<br />Biscayne Boulevard from NE 87th Avenue to NE 121st Street
<br />A ventura, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />
<br />1995-2006
<br />
<br />1996-2006
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE Check if project performed With current finn
<br />a. Project Manager and lead designer for Biscayne Boulevard, the main thoroughfare in the City of Aventura.
<br />Responsibilites included the conceptual design, construction documentation and construction administration of
<br />landscape improvements, irrigation and signage along this 2 mile stretch. Additional responsibilities included
<br />coordination of all disciplines and FDOT, presentations to the City Commission as well as coordination with City staff.
<br />
<br />(1) TITLE AND LOCATION (Cdyand Slafe)
<br />Collins Avenue Streetscape
<br />Village ofBal Harbour, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />1994 1995
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cosl, elc.) AND SPECIFIC ROLE Check if project performed With current firm
<br />b. Project Manager and lead designer for the Collins Avenue Streetscape in the Village ofBal Harbour, Florida. This
<br />project involved the conceptual design, construction documentation and construction administration, Primary
<br />responsibilities included the design of decorative paving, bus shelters, benches, lighting and landscaping. It also
<br />invloved coordinating with FOOT, the Civil and Electrical Engineer, as well as the Village staff and Council.
<br />
<br />(1) TITLE AND LOCATION (Cily and Slafe) (2) YEAR COMPLETED
<br />SR 5/US-1 Landscape Improvement from Cardsound Road to SW 304th St. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Miami, Florida
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cost. f!lc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />C.
<br />Project Manager and lead designer for the redevelopment of SR 5/USI within the City of Homestead and Florida City.
<br />Responsibilities included the development of landscape plans that proposed desirable native and naturalized vegetation
<br />which was low maintenance and drought tolerant.
<br />
<br />(1) TITLE AND LOCATION (City and Slale)
<br />FOOT - US I Exclusive Bus Lanes
<br />Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />1998 2000
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cosl. etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />d. Project Manager and lead designer for exclusive bus lanes along an eight mile corridor paralleling US-I in south
<br />Miami-Oade County, This FOOT project provided bus shelters, a bicycle path, and extensive landscaping along a 100'
<br />right-of-way purchased from the FEC railroad, Responsibilities included the development ofaxeriscape conscious
<br />planting design that beautified this major arterial corridor, It also required public involvement, close coordination with
<br />FOOT, MDT A and the Civil Engineers.
<br />(1) TITLE AND LOCATION (Clly and Stale)
<br />Biscayne Boulevard enhancement from NE 87th Avenue to NE 121st Street
<br />Miami, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2004 2006
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size, cosl, elc.) AND SPECIFIC ROLE Check if project performed with currenl firm
<br />e, Biscayne Boulevard from NE 87th A venue to NE 12 I st Street, an FDOT roadway, is the connection of neighborhoods
<br />within an urban vehicular and pedestrian corridor, It is an important arterial roadway that intersects the Village of
<br />Miami Shores and Miami-Dade County, Responsibilities included several public involvement meetings, conceptual
<br />design with renderings, construction documentation as well as post design services.
<br />
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
|