Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />12. NAME <br />Kathryn O'Leary Richards, RLA, ASLA <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />23 6 <br /> <br />15. FIRM NAME AND LOCATION (City and Slate) <br />O'Leary Richards Design Associates, Inc. <br /> <br />16. EDUCATION (DEGREEANDSPECIAUZATION) <br />Bachelor of Landscape Architecture <br />University of Florida, 1985 <br /> <br />Miami, Florida <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida Landscape Architect #00001317 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.) <br />Member of the American Society of Landscape Architects <br />FNGLA Award of Excellence for Collins Avenue, Bal Harbour, Florida <br />2005 Award for Best So. Florida Playground from Parenting Magazine, Evelyn Greer Park, Pinecrest, Florida <br /> <br /> <br />(1) TITLE AND LOCATION (Cily and Slate) <br />Biscayne Boulevard from NE 87th Avenue to NE 121st Street <br />A ventura, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />1995-2006 <br /> <br />1996-2006 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE Check if project performed With current finn <br />a. Project Manager and lead designer for Biscayne Boulevard, the main thoroughfare in the City of Aventura. <br />Responsibilites included the conceptual design, construction documentation and construction administration of <br />landscape improvements, irrigation and signage along this 2 mile stretch. Additional responsibilities included <br />coordination of all disciplines and FDOT, presentations to the City Commission as well as coordination with City staff. <br /> <br />(1) TITLE AND LOCATION (Cdyand Slafe) <br />Collins Avenue Streetscape <br />Village ofBal Harbour, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />1994 1995 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cosl, elc.) AND SPECIFIC ROLE Check if project performed With current firm <br />b. Project Manager and lead designer for the Collins Avenue Streetscape in the Village ofBal Harbour, Florida. This <br />project involved the conceptual design, construction documentation and construction administration, Primary <br />responsibilities included the design of decorative paving, bus shelters, benches, lighting and landscaping. It also <br />invloved coordinating with FOOT, the Civil and Electrical Engineer, as well as the Village staff and Council. <br /> <br />(1) TITLE AND LOCATION (Cily and Slafe) (2) YEAR COMPLETED <br />SR 5/US-1 Landscape Improvement from Cardsound Road to SW 304th St. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami, Florida <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size, cost. f!lc.) AND SPECIFIC ROLE Check if project performed with current firm <br />C. <br />Project Manager and lead designer for the redevelopment of SR 5/USI within the City of Homestead and Florida City. <br />Responsibilities included the development of landscape plans that proposed desirable native and naturalized vegetation <br />which was low maintenance and drought tolerant. <br /> <br />(1) TITLE AND LOCATION (City and Slale) <br />FOOT - US I Exclusive Bus Lanes <br />Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />1998 2000 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cosl. etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />d. Project Manager and lead designer for exclusive bus lanes along an eight mile corridor paralleling US-I in south <br />Miami-Oade County, This FOOT project provided bus shelters, a bicycle path, and extensive landscaping along a 100' <br />right-of-way purchased from the FEC railroad, Responsibilities included the development ofaxeriscape conscious <br />planting design that beautified this major arterial corridor, It also required public involvement, close coordination with <br />FOOT, MDT A and the Civil Engineers. <br />(1) TITLE AND LOCATION (Clly and Stale) <br />Biscayne Boulevard enhancement from NE 87th Avenue to NE 121st Street <br />Miami, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2004 2006 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size, cosl, elc.) AND SPECIFIC ROLE Check if project performed with currenl firm <br />e, Biscayne Boulevard from NE 87th A venue to NE 12 I st Street, an FDOT roadway, is the connection of neighborhoods <br />within an urban vehicular and pedestrian corridor, It is an important arterial roadway that intersects the Village of <br />Miami Shores and Miami-Dade County, Responsibilities included several public involvement meetings, conceptual <br />design with renderings, construction documentation as well as post design services. <br /> <br />STANDARD FORM 330 (612004) PAGE 2 <br />