Laserfiche WebLink
<br />,.. <br /> <br />~':4:$.1I~I!}iSl = <br /> <br />.~~'l'~1~:~~_ <br /> <br />k <br /> <br />. <br /> <br />Our Highway Department will be completing the AirportjSR 112 Connector in September of 2007 and will <br />be immediately available to start a new assignment. Our Structural Department is working with Mr. Becerra <br />and will also be completely available in July of 2007. In addition. our Bird Road/SR 826 Interchange project <br />will be completed in November of 2007. BHA has 3 RRR projects. which are 90%. 80% and 30% complete. <br />Our staff needs a new assignment. <br /> <br />Zyscovich is one of the largest architectu,-al fi,-ms in South Florida with a staff of mo,-e than 130 <br />professionals.We have the resources and expertise to expeditiously complete the work proposed by the <br />City of Sunny Isles Beach for this project. As p,-eviously mentioned, these individual a,-chitects and designers <br />have extensive experience in projects of similar size and scope and, therefo,-e their full participation in <br />this project is not only timely, but will be a tremendous asset to the overall p,-oject's success. <br /> <br />Current Projects <br /> <br />Availability of Staff <br />Carolyn Mitchell: 90% <br />Suria Yaffar: 50% <br />Bernard Zyscovich: 10% <br /> <br />AI~T <br /> <br />ENeU[liJ]IERS <br /> <br />Project Name Client Status <br />OMNI CRA Planning Omni Redevelopment District CRA 90 % Complete <br />DDA Master Plan Downtown Development Authority 70% Complete <br />Hollywood Beach CRA Hollywood Beach CRA 90% Complete <br />Master Plan <br />West Palm Beach Downtown City of West Palm Beach 90 % Complete <br />Zoning Regulations and <br />Design Standards <br />Atlantic Beach Master Plan Town of Atlantic Beach. South 90% Complete <br /> Carolina <br />Hollywood Zoning Overlay Hollywood CRA 70% Complete <br /> <br />. <br /> <br />Projects Currently Under Design <br /> <br />Project Name Description Progress <br />SW 62 Avenue New Street Lighting System 90% <br />MIC-Earlington Heights Corridor New 750 VDC Power Supply 90% <br />Biscayne Boulevard Pump Station Mechanical and Electrical Design 90% <br />SR-826/SR-836 Interchange Lighting & Utility Master Plan 90% <br />Krome Avenue New Street Lighting 90% <br /> <br />APCTE's electrical engineering staff is available to start on this assignment immediately. <br /> <br />. <br /> <br />Geosol's geothechnical engineering staff is available to start on this assignment immediately. <br />