Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />_1.]::t.1[ct~u.:r:r:r:u~ 3""!':!lY!:Jm'- E ~EP E :E ..JU <br /> <br />..J~L I <br /> <br />.- <br />.. <br /> <br />. -. -... <br />- <br />...-- <br /> <br />:-1 <br /> <br />....-.. .- <br />'-',: ~ I ': I <br /> <br />......- <br />~ <br /> <br />.. ..~. <br /> <br />~- <br />"" - <br /> <br />BHA is very familiar with the City of Sunny Isles Beach and its Construction and Development Codes. <br />I n the past few years we have provided the City with Professional Engineering services for the following <br />projects: <br /> <br />Central Island Drainage and Street Improvements <br />City of Sunny Isles Beach. FL <br />This drainage and street improvement project is part of the Comprehensive Plan to alleviate flooding <br />problems throughout the City of Sunny Isles Beach. BHA's approach to solve the flooding problems of <br />the Central Island neighborhood was to utilize Drainage wells. <br /> <br />This drainage and street improvement project is the first of its kind to utilize 22 Stormwater Drainage <br />Wells for flood control. The injection wells are modeled to equalize runoff injection to the water table. <br /> <br />Golden Shores Drainage and Street Improvements <br />City of Sunny Isles Beach. FL <br /> <br />The project encompassed four phases of development. BHA provided consulting engineering services <br />for all phases listed below: <br /> <br />. Phase I: Flood control study and evaluation of the existing <br />storm sewer system and pumping station. Completed on <br />January 2001. <br />. Phase II: Photogrammetric and planimetric mapping of this <br />80 acre site. pavement condition survey. plan production for <br />the reconstruction of the storm sewer system. street widening <br />and signalization. This phase also included the electro- <br />mechanical refurbishment of the pumping station and new <br />flood control staging. Storm sewer rehabilitation using epoxy <br />resins and polyester liner was utilized. The 9.100 linear feet <br />of storm sewer "cured in place piping" (CIPP) rehabilitation <br />process is considered the largest of its kind in the US and <br />was published on the July 2002 issue of the "Trenchless <br />Technology" magazine. Drainage problem in one section of <br />this neighborhood was accomplished by using four (4) Storm <br />Drainage Wells. <br />. Phase III: Technical assistance to the City of Sunny Isles <br />Beach for letting and bidding process for the implementation <br />of this 3.5 million construction cost project. Completed on <br />October 2001. <br />. Phase IV Consulting engineering services for the <br />construction supervision (CEI) for the construction of this <br />project. Completed on January 2003. <br /> <br />... <br /> <br />oJ <br /> <br />~\~ <br /> <br />PREsENTED TO <br /> <br />BEISWENGER, HOCH <br />& ASSOCIATES, INC. <br />-c<.<' ':>):;-- <br /> <br />IN APPREClAnON OF QUAUTY Won <br />PJ.OVIDED FOI THE DIAlNAGE <br />PaOJECT IN THE GoLDEN SHORES <br />AIfA As SpECmED IN THE <br />CAPITAL IMPIOVDaNT PLAN OF <br />THE CITY OF SUNNY ISLES BEACH. <br /> <br />l'Iaau.aT 1. 100) <br /> <br />v <br /> <br />WA'loa DAVID 5.uuoN <br />Via MAToa NOUU,.H S. EDa..c:ur <br />COMWllSlOHD. G~Y GooDWAN <br />COaonHlON'l:ll D.uofT laus...,.. <br />~ L...", lCAurno.uc 'V <br /> <br />BH.A worled on the Golden Shores Drainage ar,d <br />Strt'€t Improvemt-nt~ project The City of Sunn'Y l~les <br />beach prE'sentE-d 8H.~ wirh an award in apprecii:::lon <br />for qualit)! of work (.";'\I\.'ard shown hEff:') <br /> <br />k <br />