My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, Hoch, and Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Beiswenger, Hoch, and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:59 PM
Creation date
8/14/2008 5:02:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~11-1111:$.1I.]:$.1l.'Crn ~.l. <br /> <br />iJ~ ~~~{l!1I!IllIIII p E ~ ,. " <br /> <br />-F <br /> <br />i:; <br /> <br />-~- - , <br /> <br />.. ~ <br /> <br />... <br /> <br />I,~ <br /> <br />- <br /> <br />::: <br /> <br />Beiswenger. Hoch & Associates. Inc. (BHA) recently completed three major projects. The following <br />projects were completed on time within budget and without any claims for engineer's errors or omissions. <br />These projects are as follows: <br /> <br />$22 million - SR 934 widening from four to six lanes including landscaping <br />$9.2 million - SR 25 widening from four to six lanes including landscaping <br />$3.5 million - SR 5 widening of additional lane over the Miami River to SE 4th Street <br /> <br />These projects are all State Roads as is Collins Avenue. Two of the projects required landscaping Allof <br />the projects required MOT on state highway. survey. utility coordination and signing and marking. <br /> <br />There are two other projects which show capability. One is the $80 million Design/Build project for the <br />US 1/ Fort Lauderdale Airport. After winning this project with PCl Civil Constructors.lnc.. BHA valued <br />engineered the design criteria package. The new design saved $1 million for the owner and shortened <br />the schedule by three months. <br /> <br />k <br />
The URL can be used to link to this page
Your browser does not support the video tag.