|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />12. NAME
<br />
<br />Com lete one Section E for each ke
<br />13. ROLE IN THIS CONTRACT
<br />
<br />erson.
<br />
<br />Manuel Vega, P.E.
<br />Senior Drainage Engineer
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BS/19?5/Civil Engineering, National University of Nicaragua
<br />MS/1977/Hydraulic Engineering, University of Nebraska PE/1988/Florida
<br />MS/1983/Environmental En ineerin ,Universi of Michi an PE/1986/Michi an
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Highway Engineers
<br />
<br />A. TOTAL
<br />
<br />14. YEARS EXPERIENCE
<br />B. WITH CURRENT FIRM
<br />
<br />Senior Drainage/Environmental Engineer
<br />
<br />32
<br />
<br />2
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />.
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 816 (Oakland Park Boulevard) from Powerline Road to Bayview Drive PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Broward County, FL 2005 In Progress
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
<br /> Lead Drainage Engineer - This project involves milling and resurfacing of the existing 6-lane divided roadway. Addressing safety concerns
<br /> and bringing other roadway and structure features up to current RRR guidelines and standards, The total length of the project is 3.0 miles.
<br /> Project included all phases of engineering, preliminary and final drainage design; coordination with government environmental agencies,
<br /> prepared documentation for permitting.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR-80 (Southern Blvd) from West of SR-? to West of the Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Palm Beach County, FL 2003 In Progress
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
<br /> Senior Drainage Engineer - Currently under construction, the 4 Km. project includes reconstruction and widening from 5 lanes undivided to
<br /> 8 lanes divided, a grade separation at SR-? and a bridge over C-51 Canal. Drainage design included 4,500 If of French drains and 5
<br /> retention ponds.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 836 West to Florida's Turnpike, from NW 9?th Ave to the Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL 2003 2005
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Senior Drainage Engineer - This $39M Design/Build project required the design of 2,300 If of 24" exfiltration system, 80 drainage
<br /> structures, 5 detention ponds, and outfalls to the C-2 Snapper Creek Canal Extension, the SR-836/ SR-821 HEFT Interchange Lake
<br /> System and the Fontainebleau Canal. Analyzed the water management system, supervised the design and the preparation of the drainage
<br /> plans, prepared and submitted the environmental permits.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 12th Avenue Bridge Replacement PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Florida FOOT - District 6, Miami-Dade County, FL 2004
<br />d.
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Senior Drainage Engineer - This drainage design included the Bridge Hydraulic Report for the 12th Avenue new bascule bridge over the
<br /> Miami River. The drainage design included detention pond and French drains to accommodate water quality and quantity requirements.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 12th Street from NW 13?th Avenue to NW 111th Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami-Dade County Public Works, Miami, FL 1999-2000 (3 phases) 2001
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Senior Drainage Engineer - This design/build project consisted of the widening from 2 to 6 lanes to complement the roadway improvements
<br /> around the S250M Dolphin Mall which required the design of 6,900 If of 24" exfiltration system, 140 drainage structures, and outfalls to the
<br /> Imperial Lake, and the NW 12th Street! SR-821 HEFT Interchange lake system. Analyzed the water management system, supervised the
<br /> design and the preparation of the drainage plans, prepared and submitted the environmental permits
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
<br />.
<br />
|