My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, Hoch, and Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Beiswenger, Hoch, and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:59 PM
Creation date
8/14/2008 5:02:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />,2. NAME <br /> <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />erson. <br /> <br />Felix Cebrecos, M.S. <br />Traffic I Transportation Engineer <br />15. FIRM NAME AND LOCATION (City and State) <br />Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BS/1971/Civil Engineer <br />MS/1975/Civil & Environmental Engineer, University of Wisconsin <br />MS/1987/Urban and Re ional Plannin , Ohio State Universi <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards. etc.) <br />Institute of Transportation Engineers International Road Federation <br /> <br />A. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />B. WITH CURRENT FIRM <br /> <br />Transportation Planner / Traffic Engineer <br /> <br />31 <br /> <br />18 <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-5/ Brickell Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 8/2005 1 0/2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Transportation Engineer - This project in downtown Miami is the widening of SR-51 Brickell Ave to add an additional lane over the Miami <br /> River. The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close <br /> proximity of the construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the <br /> ROW. MOT was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NE 1st and NE 2nd Avenue from NE 5th Street to NE 11th Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> City of Miami, FL 6/2005 2007 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Transportation Engineer - This project in the a heavily urbanized section of downtown Miami included pavement milling and resurfacing, re- <br /> design of two intersections, drainage modifications, permitting, pavement marking and signing, signal modifications, utility coordination and <br /> RR coordination. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 25 / Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 2/2004 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Transportation Engineer - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12 <br /> million widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th <br /> Ave to W. 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required <br /> depressing roadway under existing railroad. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 3/2003 2006 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> . Check if project performed with current firm <br /> Transportation Engineer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the <br /> FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three <br /> span steel I-girder bridges. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-95/Palm Beach International Airport Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Palm Beach County, FL 1999 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Transportation Engineer - This is a 3-level directional interchange that connects 1-95 with the Palm Beach International Airport. The <br /> interchange has 14 bridges totaling 14,238 linear ft., of which 8 are concrete segmental erected by the balanced cantilever method and 6 <br /> are steel plate girder bridges. Construction Cost: $1 05M. This project received 2005 FICE Grand Award for Engineering Excellence. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.