Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />.2. NAME <br />Gustavo Garrido, P.E. <br />Senior Highway Engineer <br />15. FIRM NAME AND LOCATION (City and State) <br />Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />erson. <br /> <br />A. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />B. WITH CURRENT FIRM <br /> <br />Cost Estimator <br /> <br />6 <br /> <br />3 <br /> <br />BS/1988/Civil Engineering, Peru Professional Engineer in the State of California; endorsement <br />MS/1992/Civil En ineerin ,Peru of PE License with the State of Florida in Process <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 816 (Oakland Park Boulevard) from Powerline Road to Bayview Drive PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Broward County, FL 2007 Iln Progress <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Highway Engineer - This project involves milling and resurfacing of the existing 6-lane divided roadway, Addressing safety concerns and <br /> bringing other roadway and structure features up to current RRR guidelines and standards. The total length of the project is 3.0 miles. <br /> Project included all phases of engineering, preliminary and final drainage design; coordination with government environmental agencies, <br /> prepared documentation for permitting. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-80 (Southern Blvd) from West of SR-7 to West of the Turnpike PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Palm Beach County, FL 2007 Iln Progress <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Highway Engineer - Currently under construction, the 4 Km, project includes reconstruction and widening from 5 lanes undivided to 8 lanes <br /> divided, a grade separation at SR-7 and a bridge over C-51 Canal. Drainage design included 4,500 If of French drains and 5 retention <br /> ponds. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-5 1 Brickell Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 8/2005 110/2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Senior Highway Engineer - This project in downtown Miami is the widening of SR-5 1 Brickell Ave to add an additional lane over the Miami <br /> River. The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close <br /> proximity of the construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the <br /> ROW. MOT was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 3/2003 I 2006 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Senior Highway Engineer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the <br /> FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three <br /> span steel I-girder bridges. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 72nd Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade County, FL I <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> . Check if project performed with current firm <br /> Widening and reconstruction of NW 72nd Avenue from a 2-lane to a 5-lane urban arterial. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />. <br />