|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />.2. NAME
<br />Gustavo Garrido, P.E.
<br />Senior Highway Engineer
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />Com fete one Section E for each ke
<br />13. ROLE IN THIS CONTRACT
<br />
<br />erson.
<br />
<br />A. TOTAL
<br />
<br />14. YEARS EXPERIENCE
<br />B. WITH CURRENT FIRM
<br />
<br />Cost Estimator
<br />
<br />6
<br />
<br />3
<br />
<br />BS/1988/Civil Engineering, Peru Professional Engineer in the State of California; endorsement
<br />MS/1992/Civil En ineerin ,Peru of PE License with the State of Florida in Process
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />.
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 816 (Oakland Park Boulevard) from Powerline Road to Bayview Drive PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Broward County, FL 2007 Iln Progress
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
<br /> Highway Engineer - This project involves milling and resurfacing of the existing 6-lane divided roadway, Addressing safety concerns and
<br /> bringing other roadway and structure features up to current RRR guidelines and standards. The total length of the project is 3.0 miles.
<br /> Project included all phases of engineering, preliminary and final drainage design; coordination with government environmental agencies,
<br /> prepared documentation for permitting.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR-80 (Southern Blvd) from West of SR-7 to West of the Turnpike PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Palm Beach County, FL 2007 Iln Progress
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
<br /> Highway Engineer - Currently under construction, the 4 Km, project includes reconstruction and widening from 5 lanes undivided to 8 lanes
<br /> divided, a grade separation at SR-7 and a bridge over C-51 Canal. Drainage design included 4,500 If of French drains and 5 retention
<br /> ponds.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR-5 1 Brickell Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL 8/2005 110/2006
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
<br /> Senior Highway Engineer - This project in downtown Miami is the widening of SR-5 1 Brickell Ave to add an additional lane over the Miami
<br /> River. The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close
<br /> proximity of the construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the
<br /> ROW. MOT was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Hialeah, FL, Miami-Dade County 3/2003 I 2006
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
<br /> Senior Highway Engineer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the
<br /> FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three
<br /> span steel I-girder bridges.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 72nd Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL I
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br /> . Check if project performed with current firm
<br /> Widening and reconstruction of NW 72nd Avenue from a 2-lane to a 5-lane urban arterial.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
<br />.
<br />
|