Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com lete one Section E for each ke erson. <br />2. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Louis Belmonte, P.E. A. TOTAL B. WITH CURRENT FIRM <br />Civil/Field Engineer Constructability Engineer 50+ 22 <br />15. FIRM NAME AND LOCATION (City and State) <br />Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />PE/38375/FL (Civil Engineering), PE/13761-E/PA (Civil Engineering) <br />BS/ Civil En ineer, Tem Ie Universit , Philadel hia GC/359225/FL General Contractor, PLS/7078E/PA Surve in <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />ASHE, ASCE <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-826 (Palmetto Expressway) Interchange at Miller Drive, Bird Road & Don PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Shula Expwy, Miami-Dade County, FL 2004 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project pertormed with current firm <br /> Constructability Reviewer - By improving the PD&E Concept, using 4,312 linear feet of steel box girders & steel plate girders, ROW costs <br /> were avoided at all critical locations; the savings were over $15M. This was done by modifying the concept 3-level interchange to 2-levels <br /> by creating a state-of-the-art bridge at SR-826 over Bird Road. The project is currently in the final design phase; estimated bridge <br /> construction cost $56M. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 25 / Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 2004 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project pertormed with current firm <br /> Constructability Reviewer - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12 <br /> million widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th <br /> Ave to W, 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required <br /> depressing roadway under existing railroad. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 2003 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> . Check if project pertormed with current firm <br /> Constructability Reviewer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the <br /> FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three <br /> soan steell-airder bridaes. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Intermodal Center (MIC) Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 2002 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> . Check if project pertormed with current firm <br /> Constructability Reviewer - This project required the modification of an existing interchange to provide direct access to the Miami <br /> Intermodal Center (MIC) and the Miami International Airport (MIA), It also included the Preliminary Design for the Interconnector Roadway <br /> between SR-836 and SR-112 alona the Lejeune Corridor, a critical comoonent of the Master Plan <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fort Lauderdale-Hollywood International Airport Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Fort Lauderdale and Hollywood, FL, Broward County 2003 2003 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project pertormed with current firm <br /> Constructability Reviewer - This design/build project as a complete redesign of the access to the airport from US 1 and 1-595. From the <br /> original concept BHA was able to provide a VECP, which reduced bridge structures by 25%, reduced the overall height of the interchange <br /> by 17 ft., eliminated 14 degree curves from major movements, increased design speed on 4 of the traffic movements all while maintaining <br /> the same level of services. Cost $82M. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />. <br />