Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />2. NAME <br />Oracio Riccobono, P.E. <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Geotechnical Engineer <br /> <br />erson. <br /> <br />A. TOTAL <br />20 <br /> <br />14. YEARS EXPERIENCE <br />B. WITH CURRENT FIRM <br />7 <br /> <br />15. FI RM NAME AND LOCATION (City and State) <br />GEOSOL, Inc.; 5795-A NW 15151 Street. Miami Lakes. FL 33014 <br />16. EDUCATION (Degree and Specialization) <br />Civil Engineer (BSCE) and Master Degree (MSCE in Geotechnical <br />En inerin <br />18. OTHER PROFESSIONAL QUALI FICA TIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers <br />Florida Engineering Society <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Registration No. 49324 (Florida, Civil Engineering) <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> to Osceola Counties 2003 - 2008 N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of <br /> geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design <br /> nh~'A' PrniAd h~, ,nf $1 <; millinn'. Tn rl~tA WA h~vQ C"~~QCCf II I Q<; Twn onr hOVA ,nAnt $1-::\ millinn, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MIC-MIA Elevated People's Mover, Miami-Dade County, FL, FOOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2004 - 2006 ON-GOING <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering <br /> report with foundation design and construction recommendations for the new viaduct bridge that will provide connection between the Miami Intermodal <br /> Center IMIC) and the Miami International Airport (MIA). Geotechnical fees were $200,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Bridge Replacement for New Railroad Tracks Over the New River, Broward County, FL, TR/- PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> COUNTY COMMUTER RAIL 2001 - 2003 2004 - 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Project Geotechnical Engineer responsible for planning the preliminary geotechnical exploration and laboratory testing programs, preparation of the preliminary geotechnical <br /> engineering reports during preparation of Design-Build Documents for the new Viaduct bridge. Also, involved during construction reviewing and approving contractor's <br /> submittals and performing verification type testing. Geotechnical fees during design were $500.000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 and NW 36th Stree~ Interchange, Miami-Dade County, FL, FOOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2001- 2003 2004 - 2006 <br />d. <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs. preparation of geotechnical engineering report with <br /> foundation design and construction recommendations for the new bridges and retaining walls. Geotechnical fees were $250,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 and Okeechobee Road, Miami-Dade County, FL, FOOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2001-2003 2004 - 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm <br /> Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with <br /> foundation design and construction recommendations for the new bridges and retaining walls. Geotechnical fees were $150,000 <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />. <br />