My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, Hoch, and Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Beiswenger, Hoch, and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:59 PM
Creation date
8/14/2008 5:02:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20, EXAMPLE PROJECT KEY NUMBER <br /> <br />21. TITLE AND LOCATION (City and State) <br /> <br />22. YEAR COMPLETED <br /> <br />Central Island Drainage and Street Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />City of Sunny Isles Beach, FL August 2007 October 2008 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />Rick Conner 305-947-0606 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br />. <br /> <br /> <br />Beiswenger, Hoch and Associates was invited to evaluate a previously design <br />stormwater drainage system. BHA evaluated that system and upon an environmental, <br />feasibility and cost evaluation, recommended for a new design using a series of <br />drainage wells interconnected for flow equalization. The system recommended by BHA <br />eliminated direct outfalls to the ecological sensitive Dumbfoundling Bay. <br /> <br />This drainage and street improvement project is part of the Comprehensive Plan to <br />alleviate flooding problems throughout the City of Sunny Isles Beach. BHA's approach <br />to solve the flooding problems of the Central Island neighborhood was to utilize <br />Drainage wells. <br /> <br />This drainage and street improvement project is the first of its kind to utilize 22 <br />Storm water Drainage Wells for flood control. The injection wells are modeled to <br />equalize runoff injection to the water table. <br /> <br />Relevance shows work in City of Sunny Isles Beach. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br /> <br />(1) Firm Name <br />Beiswenger, Hoch & Associates, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />North Miami Beach, FL <br /> <br />(3) ROLE <br />Value Engineering & Final Design <br /> <br />b. <br /> <br />(1) Firm Name <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br /> <br />(1) Firm Name <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br /> <br />(1) Firm Name <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br /> <br />(1) Firm Name <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. <br /> <br />(1) Firm Name <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.