My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berger Avart, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Berger Avart, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:00 PM
Creation date
8/15/2008 1:43:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Berger Avort <br /> <br />f'...: C n q P RAT [ L <br /> <br />RFQ 07-07-03 <br />Professional Design Services for the Collins Avenue Streetscape <br /> <br />BERGER A V ART'S CURRENT/PROJECTED WORKLOAD <br /> Staff-Hours Per Quarter <br /> 4th QTR 1 st QTR <br />ACTIVE PROJECTS CLIENT YR 2007 YR 2008 <br />Miami Springs Middle School MOCPS 480 240 <br />SR 826 (Palmetto at SR 41) FOOT - 6 100 100 <br />SBBC Peer Review SBBC 240 240 <br />SBBC Staff Assistance SBBC 120 120 <br />EHPA Roof Top Protection SBBC 120 120 <br />Palmetto Senior Hiqh School MOCPS 200 200 <br />Sunset Elementary School MOCPS 200 200 <br />Water Main Extension Oesiqn MOWASO 120 120 <br />Behia Honda Bridqe Oesiqn FOOT - 6 200 100 <br />SR 84 Roadway Oesiqn FOOT - 4 200 200 <br />School "WNW' Threshold Insp. MOCPS 100 100 <br />Other Misc. Projects VARIOUS 400 330 <br />Total Per Quarter 2480 2070 <br />Grand Total 6 Months 4550 <br /> <br /> BERGER A V ART'S <br /> CURRENT/PROJECTED RESOURCES <br /> HOURS PERCENT HOURS PERCENT <br /> COMMITTED COMMITTED AVAILABLE AVAILABLE <br /> TOTAL STAFF ON OTHER ON OTHER FOR THIS FOR THIS <br />NAME POSITION HOURS PROJECTS PROJECTS PROJECT PROJECT <br />Lin Li, P.E. Project Manaqer 960 200 21% 760 79% <br />Luis Olivares, P.E. QA Engineer 960 600 63% 360 38% <br />Alfredo Reyna, P.E. Civil Engineer 960 300 31% 660 69% <br />Arthur Miller, P.E. Structural Enqineer 960 400 42% 560 58% <br />Jorqe Canales, P.E. Senior Enqineer 960 500 52% 460 48% <br />Norma Alvarez Civil Enqineer 960 200 21% 760 79% <br />German Arenes Proiect Enqineer 960 600 63% 360 38% <br />Ruben lIizarbe, E.!. Civil Enqineer 960 200 21% 760 79% <br />Everton Kinq Proiect Enqineer 960 300 31% 660 69% <br />Mary Cardenas Civil Engineer 960 200 21% 760 79% <br />TOTALS 12480 4550 36% 7930 64% <br /> <br />Assume 160 hours per month for each full time person x 6 months = 960 hours <br /> <br />Technician hours are not included; however, technicians are available at approximately the same overall <br />availability of 64%. <br /> <br />- 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.