Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Berger Ava rt <br /> <br />h',~(\RP iRftTFL <br /> <br />RFQ 07-07-03 <br />Professional Design Services for the Collins Avenue Streetscape <br /> <br />implemented to investigate impacts at the adjoining intersection and, roads and to determine the length <br />of the drop off. <br /> <br />US 1/0verseas Highway at Snake Creek, Monroe County This project involved the improvements to <br />an existing two lane, two way highway. Services provided included paving, grading, drainage, signing <br />and marking, maintenance of traffic control plans, roadway and shoulder widening, bike path, guardrail, <br />sheet pile wall and other roadway enhancements. <br /> <br />SR 5 (US 1) from SW 112th Avenue to SW 152"d Street, Miami-Dade County. This project involved <br />the improvements to an existing six lane divided roadway. Services provided included paving, grading, <br />drainage, signing and marking, and roadway enhancement to bring the facility up to safe functional <br />levels. <br /> <br />RRR of SR 5 (US 1) from SW 112th Avenue to SW 152"d Street. (Miami- <br />Dade County, FDOT District VI). This project involved the improvements to an existing six-lane <br />undivided roadway, under very heavy traffic. Services provided included paving, grading, drainage, <br />signing/markings, lighting, signalization and overall enhancement to bring the roadway up to adequate <br />structural and functional levels. <br /> <br /> <br />SR 607 (Emerson Avenue) from SR 614 (Indrio Road) to the St Lucie <br />County Line, (FDOT District IV) Improvements on this rural two lane facility <br />include, pavement milling and resurfacing, slope stabilization, drainage, <br />relocation of roadway signs and mail boxes which were originally located <br />inside the clear zone and installation of guard rail. <br /> <br />Reconstruction of SR 91 / Florida Turnpike. Reconstruction from <br />North Miami Toll Plaza to NW 199th Street (Pro-Player Stadium Exit). <br />Project includes roadway reconstruction and a new bridge over Miami <br />Gardens Drive. The new cross section consists of a six-lane divided <br />highway with paved median and concrete barrier wall, and roadway <br />transitions to a super-elevated section to meet current design criteria. <br /> <br />. <br />.... <br /> <br />. .,~~ <br /> <br /> <br />,,;c"~,- <br /> <br />- 2.~:r "- <br />. ~(.::. ~ <br />. "4 <br /> <br />i\ . <br /> <br /> <br />4. <br /> <br />AVAilABILITY OF STAFF <br /> <br />4a. <br /> <br />The Firm's Ability to have Staff Readily Available for the Project <br /> <br />Staffing Availability and Workload Distribution: All key personnel in Civil and Roadway Construction are <br />immediately available for assignments. The total company availability for the Civil and Roadway <br />Construction Service category is about 64% for the next 6 months. See Current/Projected Resource <br />Tables next. <br /> <br />-11 - <br />