Laserfiche WebLink
<br />I <br /> <br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />12, NAME <br /> <br />I Luis A. Olivares, P.E. <br /> <br />Quality Assurance/Quality Control <br /> <br />a. TOTAL <br />25 <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT <br />FIRM <br /> <br />2 <br /> <br />I <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Berger Avart, Inc., Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALlZA TION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />1 <br /> <br />BS, Civil Engineering <br /> <br />P.E., Florida #49708 (1995)-Civil Engineering <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />I <br /> <br />Florida Engineering Society, Board of Directors; American Society of Civil Engineers, Member; Cuban American Society <br />of Civil Engineers, Member <br /> <br />I <br /> <br /> (1) TITLE AND LOCATION (City and State) (2fYEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable <br /> UNIVERSITY OF MIAMI PARKING GARAGE, CORAL GABLES, FL 2004 I 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager responsible for the civil site design and permitting of a new 15-story clinical research building and 11-story parking garage. <br /> The site consists of 350,000 SF of office space, 510,000 SF of parking garage on a 3.58-acre parcel. Due to an existing utility easement, <br />a. which bisected the property and needed to be mitigated, the site required the rerouting and relocation of existing sanitary lines that handled <br /> offsite flows while being placed under the constraints of no additional lift-stations. Due to the substantial flows this facility would be imposing <br /> on the existing wastewater system, the site also required the design of a new pump station for the Miami-Dade Water and Sewer Department <br /> (WASD). This pump station was designed for 965 gallons/min and included a generator house as an emergency back-up facility. To satisfy the <br /> twenty-five year storm design criteria, the site was designed with deep wells and emergency overflows. In addition and as required by WASD, <br /> a new 12" water main was designed to run the length of the city block and throuQh a maior intersection. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable <br /> HOMESTEAD HOSPITAL, HOMESTEAD, FL 2003 I 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm <br />b. Project Manager responsible for the civil site design including contract management and construction administration services, technical <br />reviews and quality control. The project consisted of a 150-bed hospital with out patient facilities, which totals approximately 320,000 SF with <br /> 5 out parcels for future expansion. The 60-acre site was developed to accommodate a 1,500 space parking lot, over half a mile of a 2-lane <br /> service road and one mile of a 4-lane divided roadway. Other improvements included the design of approximately 6,000 LF of 12-inch water <br /> main, 1,500 LF of 8-inch gravity sanitary sewer main, 1,600 LF of sanitary sewer force main, a Diesel Fuel service station, and a 950 gpm <br /> sanitary sewer lift station. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable <br /> COMFORT, MAINSTAY & SLEEP INN HOTELS SITE DEV., MIAMI, FL 1996 11998 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />c. Project Manager in charge of the design, permitting and construction of this project located on NW 36th Street. The assignment consisted of <br /> the development of contract documents including plans, technical specifications, an opinion of construction cost, and construction <br /> administration services. The project consisted of designing the site drainage for a 3~ acre site, pavement and grading of parking areas and <br /> utilities relocation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable <br /> EDISON K-8 AND 117B CHARTER SCHOOLS, MIAMI, FL 2001 1 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d. <br /> Project Manager responsible for contract management and construction administration services, technical reviews, and quality control for the <br /> site development of these new schools including water (potable and fire protection), sewer, paving, grading, drainage, electrical and <br /> communication. <br />- <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION if a Iicable <br /> <br /> <br />2004 <br /> <br />I <br /> <br />FEDERAL EXPRESS HUB, MIAMI, FL <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br />2003 <br /> <br />o Check if project performed with current firm <br /> <br />e. <br /> <br />Project Manager for this project which consisted of the design and construction of the airside and lands ide pavements, as well as all site <br />utilities such as water and sewer system, electric and communications ductwork, site lighting and drainage improvements, to serve a new sort <br />warehouse building. Also responsible for all elements of the coordination of the permitting process, safety plans, construction phasing and <br />maintenance of operations. <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />