|
<br />I
<br />
<br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />12, NAME
<br />
<br />I Luis A. Olivares, P.E.
<br />
<br />Quality Assurance/Quality Control
<br />
<br />a. TOTAL
<br />25
<br />
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT
<br />FIRM
<br />
<br />2
<br />
<br />I
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Berger Avart, Inc., Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALlZA TION)
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />1
<br />
<br />BS, Civil Engineering
<br />
<br />P.E., Florida #49708 (1995)-Civil Engineering
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />I
<br />
<br />Florida Engineering Society, Board of Directors; American Society of Civil Engineers, Member; Cuban American Society
<br />of Civil Engineers, Member
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2fYEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> UNIVERSITY OF MIAMI PARKING GARAGE, CORAL GABLES, FL 2004 I 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager responsible for the civil site design and permitting of a new 15-story clinical research building and 11-story parking garage.
<br /> The site consists of 350,000 SF of office space, 510,000 SF of parking garage on a 3.58-acre parcel. Due to an existing utility easement,
<br />a. which bisected the property and needed to be mitigated, the site required the rerouting and relocation of existing sanitary lines that handled
<br /> offsite flows while being placed under the constraints of no additional lift-stations. Due to the substantial flows this facility would be imposing
<br /> on the existing wastewater system, the site also required the design of a new pump station for the Miami-Dade Water and Sewer Department
<br /> (WASD). This pump station was designed for 965 gallons/min and included a generator house as an emergency back-up facility. To satisfy the
<br /> twenty-five year storm design criteria, the site was designed with deep wells and emergency overflows. In addition and as required by WASD,
<br /> a new 12" water main was designed to run the length of the city block and throuQh a maior intersection.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> HOMESTEAD HOSPITAL, HOMESTEAD, FL 2003 I 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />b. Project Manager responsible for the civil site design including contract management and construction administration services, technical
<br />reviews and quality control. The project consisted of a 150-bed hospital with out patient facilities, which totals approximately 320,000 SF with
<br /> 5 out parcels for future expansion. The 60-acre site was developed to accommodate a 1,500 space parking lot, over half a mile of a 2-lane
<br /> service road and one mile of a 4-lane divided roadway. Other improvements included the design of approximately 6,000 LF of 12-inch water
<br /> main, 1,500 LF of 8-inch gravity sanitary sewer main, 1,600 LF of sanitary sewer force main, a Diesel Fuel service station, and a 950 gpm
<br /> sanitary sewer lift station.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> COMFORT, MAINSTAY & SLEEP INN HOTELS SITE DEV., MIAMI, FL 1996 11998
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />c. Project Manager in charge of the design, permitting and construction of this project located on NW 36th Street. The assignment consisted of
<br /> the development of contract documents including plans, technical specifications, an opinion of construction cost, and construction
<br /> administration services. The project consisted of designing the site drainage for a 3~ acre site, pavement and grading of parking areas and
<br /> utilities relocation.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> EDISON K-8 AND 117B CHARTER SCHOOLS, MIAMI, FL 2001 1 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />d.
<br /> Project Manager responsible for contract management and construction administration services, technical reviews, and quality control for the
<br /> site development of these new schools including water (potable and fire protection), sewer, paving, grading, drainage, electrical and
<br /> communication.
<br />-
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION if a Iicable
<br />
<br />
<br />2004
<br />
<br />I
<br />
<br />FEDERAL EXPRESS HUB, MIAMI, FL
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />
<br />2003
<br />
<br />o Check if project performed with current firm
<br />
<br />e.
<br />
<br />Project Manager for this project which consisted of the design and construction of the airside and lands ide pavements, as well as all site
<br />utilities such as water and sewer system, electric and communications ductwork, site lighting and drainage improvements, to serve a new sort
<br />warehouse building. Also responsible for all elements of the coordination of the permitting process, safety plans, construction phasing and
<br />maintenance of operations.
<br />
<br />I
<br />
<br />I
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|