|
<br />I
<br />
<br />I
<br />
<br />12, NAME
<br />
<br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />54
<br />
<br />14. YEARS EXPERIENCE
<br />lb. WITH CURRENT FIRM
<br />
<br />25
<br />
<br />Arthur J. Miller, P.E.
<br />
<br />Constructability-Sidability Review
<br />
<br />a. TOTAL
<br />
<br />I
<br />
<br />15. FIRM NAME AND LOCATION (CIty and State)
<br />Berger Avart, Inc., Miami, Florida
<br />16, EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />I
<br />
<br />MS, Civil Engineering
<br />
<br />P.E., Florida #21471 (1961)-Civil Engineering
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />I
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> VENETIAN TOLL AND ADMINISTRATION BUILDING, MIAMI, FL 2003 I 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />a. Structural Engineer for the preparation of construction documents for a new toll facility and adjacent administration building, with
<br /> landscaping, bike paths, and walkways. The toll plaza contains six vehicle lanes, with attendant booths and complete electronic toll
<br /> collection equipment. The separate administration building provides management headquarters for all Dade County toll facilities,
<br /> communication, public decal sales, and staff support facilities. (Cost: $1.5 million)
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> MIA CHILLER PLANT EAST EXPANSION, MIAMI, FL 2001 I 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />b. Structural Engineer for the preparation of construction documents for approximately 100,000 square feet of additional space to expand the
<br /> existing six-story, 139-foot-high central chiller plant to accommodate a new chilled capacity of 16,000 tons of refrigeration for the Miami
<br /> International Airport. This required providing a 150% increase in capacity on a very restricted site, while maintaining an uninterrupted
<br /> supply of chilled water. (Cost: $65 million; Design Fee: $500,000)
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> EHPA INSPECTIONS, CERTIFICATIONS & REPORTS, BROWARD PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> COUNTY, FL 2006 I N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />c. Certifying engineer of record to perform EHPA re-certification inspection of all schools located throughout Broward County that contain
<br /> shelter facilities. As per the Florida Building Code (FBC) Section 24 (0, all designated Enhanced Hurricane Protection Areas
<br /> (EHPA's)/Shelters shall be inspected and certified for compliance with the structural requirements of FBC Section 24, Public Shelter
<br /> Design Criteria, every 5 years by a Florida registered professional engineer skilled in structural design. The original design plans for each
<br /> school were reviewed and the school inspected to determine whether the school was constructed to code as per the design plans.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> GEN. STRUCTURAL ENGINEERING SERVICES, BROWARD COUNTY, FL 2003 I N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d.
<br /> Engineer of Record serving as an extension of the Broward County School Board Facilities Design group for the structural review of a
<br /> multitude of new school and renovation projects designed by other firms. This effort included many major schools and prototype designs.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> OLYMPIA HEIGHTS POST OFFICE, MIAMI, FL 1992 11993
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />e. Project Manager responsible for the design, construction documents, and construction services for a new 7,000 sq. ft. branch postal facility
<br /> in West Dade. The structure is precast, prestressed concrete and the exterior is architectural concrete. All architecture and engineering
<br /> services were provided for planning and design of public lobby areas, counters, postal boxes, parking, loading and unloading areas,
<br /> sorting rooms and worker facilities. Site development included public parking, parking for postal vehicles and drive through mail
<br /> depositories. (Cost: $850,000)
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
<br />I
<br />
|