<br />12. NAME
<br />
<br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />23
<br />
<br />14. YEARS EXPERIENCE
<br />I b, WITH CURRENT FIRM
<br />
<br />.5
<br />
<br />Alfredo Reyna, P.E.
<br />
<br />Civil Engineer
<br />
<br />a, TOTAL
<br />
<br />I
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Berger Avart, Inc., Miami, Florida
<br />16, EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />B.S.C.E., Florida International University, 1986
<br />B.S.M.E., Florida International University, 1985
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />I
<br />
<br />P.E., Florida #44766 (1991) -Civil Engineering
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FOOT District 6, Collector-Distributor (CD) Roadway, Miami PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> Intermodal Center, Miami, FI April 2003 I Under Construction
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />a. Project Manager responsible for the complete roadway design and plan preparation for new roadway system connecting MIA to SR-836
<br /> including electronic delivery and electronic specifications. Project also includes the design of AASHTO beam bridge structures, substructure for
<br /> Hammerhead and pier type on drilled shaft foundation.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FOOT District 6, Palmetto Expressway/NW 25th Street PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> Interchange Reconstruction, Miami, FI 1999 12002
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />b.
<br /> Project Engineer. Project involved the design and reconstruction of the interchange, the replacement of the existing bridge due to a change in
<br /> profile and main line realignment. This project also included coordination of water and sewer, drainage, pavement markings, right-of-way, etc.
<br /> Design also included the new retaining walls along SR-826 and the review of bridge plans.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FOOT District 6, Expansion of PalmettolDolphin Interchange (SR- PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> 826/ SR-836), Miami, FI 1992-1996 I N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />c. Project Engineer. Project encompassed the complete interchange reconstruction of two of Miami-Dade County's busiest urban expressways
<br /> near Miami International Airport. Responsible for segmenting a new six-level interchange project into five separate construction projects.
<br /> Under the guidelines for each of these projects existing number of travel lanes was maintained and specific TCP was developed.
<br /> Responsibilities also included the vertical geometry composed of 72 profiles for mainline and ramp system, and modification of six signalized
<br /> intersections.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FOOT District 6: Widening of SR-836 Expressway/NW 72nd PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> Avenue, Miami, FI December 1998 12000
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />d. Project Engineer responsible for the design for the widening of NW 72nd Avenue from four-lanes to six-lanes, adding curb and gutters.
<br /> Construction plans, specifications and special provisions were prepared. The plans included milling and resurfacing, subgrade stabilization,
<br /> limerock base and asphaltic concrete surface course, drainage structure adjustments, signing and pavement markings, lighting, landscaping,
<br /> signalization, TCP and cost estimates.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FOOT District 6: Intersection Improvements: NW 103rd Street PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> and NW 87th Avenue (near Okeechobee Road), Miami, FI 2002 12004
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />e.
<br /> Project Manager responsible for the preparation of plans and specifications for the engineering design of the NW 103rd Street intersection at NW
<br /> 87th Avenue. The project included lane widening, milling and resurfacing, pavement markings, drainage improvements, signage, TCP, utilities, and
<br /> signalization. Additionally, the project encompassed parking lot modification including a new drainage system.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
|