Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />12, NAME <br /> <br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />I <br /> <br />Ruben llizarbe, E.I. <br /> <br />a. TOTAL <br /> <br />Civil Engineer <br /> <br />6 <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />Berger Avart, Inc., Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />14. YEARS EXPERIENCE <br />I b, WITH CURRE;T FIRM <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />1 <br /> <br />BS, Civil Engineering <br /> <br />E.I. Florida #1100008662 (2003)-Civil Engineering <br /> <br />I <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTIONOf applicable <br /> NW 62ND AVE BRIDGE OVER LITTLE RIVER, HIALEAH, FL N/A I 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />a. <br /> Project Engineer responsible for the design and detailing of the attachment of existing 12" water main across the C-7 canal, verification <br /> of field conditions, structural capacity of existing end bents and intermediate bents, and preparation of quantities. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable <br /> EAST 79TH STREET BRIDGE REHABILITATION, NORTH MIAMI, FL 2003 I 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />b. Project Engineer responsible for providing technical assistance during the review of shop drawings, and performing inspections for the <br /> rehabilitation of four 17 -span low level bridges and two bascule bridges. The rehabilitation consists of repairing pre-stressed/post- <br /> tensioned deck/slab units, pre-stressed AASHTO girders, cast-in-place bent caps, bridge fender system, painting of structural steel on <br /> bascule leaves, repair of mechanical and electrical component associated with the bascule leaves, and replacement of steel <br /> maintenance platform. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable <br /> CORAL GABLES HIGH AUDITORIUM DOME, CORAL GABLES, FL 2005 I N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Project Engineer for the structural inspection of the cupola located along the roof of the auditorium at Coral Gables Senior High School. <br />c. The inspection consisted of visually inspecting all structural components (roof deck, roof joists, supporting beams, framing members, <br /> etc.) associated with the structural integrity of the cupola and adjacent roof structure. The purpose of the inspection was to determine <br /> the current condition of the structure and develop repair recommendations as required to maintain safe structures. Concerns for the <br /> structural condition of the cupola originated from evidence of termite damage along some of the wood beams, joists and framing <br /> members. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (if aoolicable <br /> NEVA KING COOPER EDUCATIONAL CENTER, HOMESTEAD, FL 2005 I N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />d. <br /> Project Engineer responsible for the structural inspection of eight aged buildings on this campus to determine and report on their <br /> structural integrity. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable <br /> SCOTT PARK FIELD HOUSE INSPECTIONS, MIAMI, FL 2005 I 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br /> Assistant Inspector responsible for field inspections and report preparation for the placement of reinforcing steel foundations, columns, <br /> and tie-beams. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />