Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />12. NAME <br /> <br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />I <br /> <br />Everton King <br /> <br />a, TOTAL <br /> <br />Structural Engineer <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Berger Avart, Inc., Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />23 <br /> <br />14. YEARS EXPERIENCE <br />I b. WITH CURRE;T FIRM <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />I <br /> <br />BS, Civil Engineering <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />I <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable <br /> VENETIAN TOLL AND ADMINISTRATION BUILDING, MIAMI, FL 2003 I 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />a. Structural Engineer for the preparation of construction documents for a new toll facility and adjacent administration building, with <br /> landscaping, bike paths, and walkways. The toll plaza contains six vehicle lanes, with attendant booths and complete electronic toll <br /> collection equipment. The separate administration building provides management headquarters for all Dade County toll facilities, <br /> communication, public decal sales, and staff support facilities. (Cost: $1.5 million) <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable <br /> MIA CHILLER PLANT EAST EXPANSION, MIAMI, FL 2001 I 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />b. Structural Engineer for the preparation of construction documents for approximately 100,000 square feet of additional space to expand <br /> the existing six-story, 139-foot-high central chiller plant to accommodate a new chilled capacity of 16,000 tons of refrigeration for the <br /> Miami International Airport. This required providing a 150% increase in capacity on a very restricted site, while maintaining an <br /> uninterrupted supply of chilled water. (Cost: $65 million; Design Fee: $500,000) <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable <br /> FLORAL HEIGHTS ELEMENTARY SCHOOL, MIAMI, FL 1998 I 2000 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />c. Structural Engineer responsible for the contract management and construction administration services including technical reviews and <br /> quality control. This project included all engineering services for a new music, arts and media center; reconstruction of toilet facilities; <br /> new lighting throughout the facility; reconstruction/expansion of administration area; new P.E. shelter; parking improvements; <br /> irrigation/landscaping/sodding; and GACP. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION(if aPPlicable <br /> SEMINOLE ELEMENTARY SCHOOL, MIAMI, FL 1998 I 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />d. Project Engineer responsible for the preparation of program and budget to increase the capacity of the facility to conform to current <br />education criteria and safety requirements. Prepared design development and construction documents consisting of drawings and <br /> specifications for each addition or renovated area. Other responsibilities included written reports for a weekly on-site visit to advise on <br /> progress of work and to guard the Board against defects and deficiencies of construction, punch list and supplying final review before <br /> occupancy, maintenance manuals and as-builts drawings. Also responsible for checking asbestos and other hazardous materials. This <br /> design and inspection included the provision of a complete SBS Modified Bitumen Mineral Surface roof system. (Cost: $2.3 million) <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aPo1icable <br /> BLEACHER INSPECTIONS, MIAMI-DADE & BROWARD COUNTIES, FL 2005 IN/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm <br />e. Structural Engineer responsible for conducting a visual inspection of all stadiums and bleachers, including seats and related facilities <br /> for all school locations containing these facilities. The inspections were performed to determine if the structures were maintained in a <br /> safe condition and were free from hazards, including cracks, rust, loose fastenings, spalling, exposed reinforcing steel, wood rot, <br /> chips, splits and wood destroying insects. The inspection established that the structures met the minimum safety, casualty and <br /> sanitation requirements for their intended use. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (112004) PAGE 2 <br />