|
<br />I
<br />
<br />I
<br />
<br />12. NAME
<br />
<br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />I
<br />
<br />Everton King
<br />
<br />a, TOTAL
<br />
<br />Structural Engineer
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Berger Avart, Inc., Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />23
<br />
<br />14. YEARS EXPERIENCE
<br />I b. WITH CURRE;T FIRM
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />I
<br />
<br />BS, Civil Engineering
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable
<br /> VENETIAN TOLL AND ADMINISTRATION BUILDING, MIAMI, FL 2003 I 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br />a. Structural Engineer for the preparation of construction documents for a new toll facility and adjacent administration building, with
<br /> landscaping, bike paths, and walkways. The toll plaza contains six vehicle lanes, with attendant booths and complete electronic toll
<br /> collection equipment. The separate administration building provides management headquarters for all Dade County toll facilities,
<br /> communication, public decal sales, and staff support facilities. (Cost: $1.5 million)
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable
<br /> MIA CHILLER PLANT EAST EXPANSION, MIAMI, FL 2001 I 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br />b. Structural Engineer for the preparation of construction documents for approximately 100,000 square feet of additional space to expand
<br /> the existing six-story, 139-foot-high central chiller plant to accommodate a new chilled capacity of 16,000 tons of refrigeration for the
<br /> Miami International Airport. This required providing a 150% increase in capacity on a very restricted site, while maintaining an
<br /> uninterrupted supply of chilled water. (Cost: $65 million; Design Fee: $500,000)
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable
<br /> FLORAL HEIGHTS ELEMENTARY SCHOOL, MIAMI, FL 1998 I 2000
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br />c. Structural Engineer responsible for the contract management and construction administration services including technical reviews and
<br /> quality control. This project included all engineering services for a new music, arts and media center; reconstruction of toilet facilities;
<br /> new lighting throughout the facility; reconstruction/expansion of administration area; new P.E. shelter; parking improvements;
<br /> irrigation/landscaping/sodding; and GACP.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION(if aPPlicable
<br /> SEMINOLE ELEMENTARY SCHOOL, MIAMI, FL 1998 I 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br />d. Project Engineer responsible for the preparation of program and budget to increase the capacity of the facility to conform to current
<br />education criteria and safety requirements. Prepared design development and construction documents consisting of drawings and
<br /> specifications for each addition or renovated area. Other responsibilities included written reports for a weekly on-site visit to advise on
<br /> progress of work and to guard the Board against defects and deficiencies of construction, punch list and supplying final review before
<br /> occupancy, maintenance manuals and as-builts drawings. Also responsible for checking asbestos and other hazardous materials. This
<br /> design and inspection included the provision of a complete SBS Modified Bitumen Mineral Surface roof system. (Cost: $2.3 million)
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION (if aPo1icable
<br /> BLEACHER INSPECTIONS, MIAMI-DADE & BROWARD COUNTIES, FL 2005 IN/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br />e. Structural Engineer responsible for conducting a visual inspection of all stadiums and bleachers, including seats and related facilities
<br /> for all school locations containing these facilities. The inspections were performed to determine if the structures were maintained in a
<br /> safe condition and were free from hazards, including cracks, rust, loose fastenings, spalling, exposed reinforcing steel, wood rot,
<br /> chips, splits and wood destroying insects. The inspection established that the structures met the minimum safety, casualty and
<br /> sanitation requirements for their intended use.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />STANDARD FORM 330 (112004) PAGE 2
<br />
|