Laserfiche WebLink
<br />I <br /> <br />20, EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />I <br /> <br />I <br /> <br />(3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Comolete one Section f for each oro/ect.) <br />21, TITLE AND LOCATION (City and State) <br /> <br />General Engineering Consulting Services, Miami, FL <br /> <br />PROFESSIONAL <br />SERVICES <br /> <br />3 <br /> <br />22. YEAR COMPLETED <br />CONSTRUCTION (if applicable) <br /> <br />2002 <br /> <br />2005 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a, PROJECT OWNER <br />Miami-Dade County DERM <br /> <br />b. POINT OF CONTACT NAME <br />Dorian Valdes, P.E <br /> <br />c, POINT OF CONTACT TELEPHONE NUMBER <br /> <br />(305) 372.6886 <br /> <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. BERGER AVART, Inc. Miami, Florida Prime Consultant <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />Through a General Engineering Consulting Professional Services Agreement (PSA) with Miami- <br />Dade County DERM, BERGER AVART provided the design for several drainage improvements <br />throughout Miami-Dade County. Projects completed under this PSA include: <br /> <br />Palm Sprinqs North Phases III and IV (Sub-Basins C9W-2-8 and CL-2-1) Stormwater Utility <br />Capital Improvements: Retrofitting the existing storm water management system by adding <br />exfiltration trenches, replacing drainage structures and cleaning the entire piping system. <br /> <br />Country Walk Basins 6 and 7 Drainaqe Improvement Proiect: Design of a french drain system and <br />outfalls to alleviate the road ftooding for six miles of local roads and drainage area of 84 acres. <br />There is a total of 13,243 LF of new french drains and two outfalls to Canal C-1 W. A section of <br />Country Walk Drive was raised due to ftooding. <br /> <br />Country Walk Basin 1: Design of a french drain system to improve the drainage conditions of 2.5 <br />miles of local roadway with a drainage contributing area of 28 acres, within an existing residential <br />zone. Project included drainage system design and drainage report with four phase submittals. <br />There are 4,126 LF of new french drains proposed. <br /> <br />Country Walk Basin 5: Design of a french drain system to improve the drainage conditions of 3.5 <br />miles of local roadways with drainage contributing area of 39 acres. Project included drainage <br />system design and drainage report with four phase submittals. There are 3,821 LF french drains <br />proposed. <br />(Cost: $5 million) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (1/2004) <br />