Laserfiche WebLink
<br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />(3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Com Jete one Section ffor each ro 'ect. <br />21. TITLE AND LOCATION (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />6 <br /> <br />West Dixie Highway from NE 1191h Street to NE 15151 Street, North Miami, <br />Florida <br /> <br />PROFESSIONAL <br />SERVICES <br /> <br />22. YEAR COMPLETED <br />CONSTRUCTION (if applicable) <br /> <br />2004 <br /> <br />06/2007 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a, PROJECT OWNER <br />FL Dept. of Transportation - District 6 <br /> <br />b. POINT OF CONTACT NAME <br />Adrianna Manzanares <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />(305) 470-5283 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />BERGER AVART was contracted by the Florida Department of Transportation to provide the design for improvements to <br />West Dixie Highway from NE 119th Street to 1515t Street in North Miami. The project design included the restriction of turning <br />movements at selected intersections; construction of raised landscaped medians along selected locations to restrict turning <br />movements and to improve aesthetics; improvement of sight visibility; removal of perpendicular storefront parking along SR <br />909; elimination of unnecessary curb cuts and driveways; upgrading the facility for handicap accessibility; milling and <br />resurfacing; signing and pavement markings; and upgrading pedestrian signal features and street signals. (Design Fee: <br />$236,000; Construction Cost $4,900,000; Construction Cost Estimate $4,300,000) <br /> <br /> <br />l__ - <br /> <br />[ --~ <br /> <br />~~":""'" <br />,~--- -- <br /> <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. BERGER AVART, Inc. Miami, Florida Prime Consultant <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (1/2004) <br />