Laserfiche WebLink
<br />II <br />I <br />I <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />(3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Com fete one Section ffor each ro 'ect. <br />21. TITLE AND LOCATION (City and State) <br /> <br />5 <br /> <br />22, YEAR COMPLETED <br />CONSTRUCTION (if applicable) <br /> <br />PROFESSIONAL <br />SERVICES <br /> <br />Krome Avenue and SW 8th Street Intersection Improvements, Miami, FL <br /> <br />2004 <br /> <br />2004 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />I <br />I <br /> <br />C. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />b. POINT OF CONTACT NAME <br />Adrianna Manzanares <br /> <br />a. PROJECT OWNER <br />FL Dept. of Transportation - District 6 <br /> <br />(305) 470-5283 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />SR 997, a rural principal arterial, is considered a main north-south artery with heavy truck traffic, and SR 90 is a principal <br />arterial in the east-west direction of Miami-Dade County. The existing bridge at Canal C-4, just north of the intersection of <br />SR 997 and SR 90, needed to be replaced by a wider bridge to accommodate full width of the roadway shoulders and <br />exclusive left and right turn lanes. These turning lanes will improve traffic movement and reduce the accident rate at the <br />Krome Avenue and SW 8th Street intersection. Reconstruction of the existing roadways included approximately Y2-mile of <br />work along Krome Avenue and :t 0.3 mile of work along SR 90. A complete drainage analysis and improvements were <br />included because the bridge and road reconstruction will add slightly over two acres of impervious areas to the site. A <br />retaining wall was added along the north side of SR 90 since Canal C-4 runs parallel to the existing road. (Cost $4.8 million; <br />Design Fee: $400,000) <br /> <br />I <br />I <br /> <br />I <br /> <br /> <br />~ <br /> <br />I <br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. BERGER AVART, Inc. Miami, Florida Prime Consultant <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (1/2004) <br />