My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berger Avart, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Berger Avart, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:00 PM
Creation date
8/15/2008 1:43:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Innovation <br /> <br />BERGER AVART utilizes the latest technology in design and plans preparation, which allows us to expedite our <br />design efforts through completion. Our in-house computer design programs are routinely applied. All deliverables are <br />provided in AutoCAD format. Our staff is thoroughly familiar with the latest design criteria and guidelines to ensure <br />compliance with required standards. <br /> <br />Quality Control and Assurance <br /> <br />BERGER A V ART's policy is to produce quality plans, specifications and estimates for all projects. Quality control is <br />an on-going operational aspect of the total work effort and is built into BERGER AVART's design process. BERGER <br />AVART's Principal-in-Charge, Luis A. Olivares, P.E., and the Team's engineers directly control this function. <br /> <br />Quality assurance will be the responsibility of the Team's reviewing engineers and BERGER AVART's Quality <br />Assurance Engineer, Arthur Miller, P.E. In accordance with our operating procedures, Mr. Miller will review every <br />task after sign-off by the Project Manager to ensure that the required quality and conformance to City criteria is <br />achieved. BERGER AVART has a comprehensive and rigid quality assurance plan. Checking, back checking and re- <br />checking is established in our Policies and Procedures Manual. Internal checklists are used to assist in document <br />reviews and ensure the completeness of the contract plans before they reach the client and/or respective parties <br />involved. These checklists are used on all our projects and are modified accordingly for specific projects. This <br />procedure is adhered to during each plan phase. <br /> <br />Summary <br /> <br />BERGER AVART has a proven track record of timely response and ahead of schedule deliveries. We offer the City <br />of Sunny Isles Beach a talented team of professionals with outstanding credentials that is committed to completing <br />each assignment successfully and efficiently. We appreciate this opportunity to present our qualifications and look <br />forward to providing high quality engineering services to the City of Sunny Isles Beach. <br /> <br />I. AUTHORIZED REPRESENTATIVE <br />The foreqoinq is a statement of facts. <br /> <br />30. SIGNATURE OF AUTHORIZED REPRESENTATIVE <br /> <br /> <br />T <br /> <br />31. DATE SIGNED: <br /> <br />September 12, 2007 <br /> <br />32. NAME AND TITLE OF SIGNER: <br /> <br />Luis A. Olivares, P.E., President <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (1/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.