My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berger Avart, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Berger Avart, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:00 PM
Creation date
8/15/2008 1:43:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. Bleacher Inspection and Certification, Various Schools (MDCPS) <br />. Seminole Elementary School New Building Expansion (Structural) and Site Improvement (Civil) Design <br />and Construction Administration (MDCPS) <br />. South Miami Heights Elementary School Playfield Improvements Design (MDCPS) <br />. Roadway Widening and Intersection Improvement at SW 87th Ave. and SW 72nd Ave. (FDOT VI) <br />. Roadway Intersection Improvement Design at US 1 and SW 67th Ave. (FDOT VI) <br />. West Dixie Highway Roadway, Pavement Marking and Signalization Design (FDOT VI) <br /> <br />Proposed Staff <br /> <br />Our proposed Project Manager, Un U, P .E., has over 15 years of relevant experience in civil and transportation <br />projects. Mr. Li will lead BERGER AVART's efforts on this project and will be the primary contact for the City's <br />Project Manager. Mr. Li has experience in the planning, design and coordination/management of major highway <br />projects, including roadway and bridge geometry, traffic, drainage, water and sanitary sewer projects. Luis Olivares, <br />P.E., as Principal-in-Charge and QA/QC officer, will provide support to Mr. Reyna and the entire Team and will lead <br />the QA/QC effort. <br /> <br />Project Start Up <br /> <br />When the City assigns a project to BERGER AVART, Mr. Li will meet with the City's Project Manager to discuss the <br />details of the services to be provided. The level of project complexity, information to be collected, project <br />requirements and number of phase reviews will be determined. Once an understanding has been reached on the <br />scope of services, BERGER AVART will then submit a staff-hour estimate, proposed fee, and preliminary schedule <br />for the completion of the project assignment. <br /> <br />Project Requirements and Data Collection <br /> <br />BERGER AVART will submit a final project schedule to the City's Project Manager within days of receiving a notice <br />to proceed. This schedule will be routinely updated to reflect all progress and any changes. A schedule will be <br />produced monthly or as directed by the City's Project Manager. <br /> <br />BERGER AVART will immediately begin to collect from the City all available existing information (as-builts, surveys, <br />geotechnical information, traffic investigations and any preliminary analysis). Each assignment will be closely <br />analyzed and an early site visit will be performed to identify areas of concern according to the project scope. <br />Photographs of the projects will be filed for later use as required during the design process. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (1/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.