|
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />12, NAME
<br />Fernando Z. Gatell, PSM
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />Project Surveyor & Mapper a TOTAL
<br />35 +
<br />
<br />14, YEARS EXPERIENCE
<br />I b WTH CURRENT FIRM
<br />18
<br />
<br />15, FIRM NAME AND LOCATION (City and State)
<br />F.R. Aleman & Associates, Inc. (Miami, Orlando, Lake Worth, Tampa, Jacksonville & Tallahassee, Florida)
<br />
<br />16 EDUCATION (DEGREE AND SPECIALlZA nON)
<br />BD
<br />Surveying Camaguey School, Cuba 1965
<br />BS
<br />Surveying Ciego de Avila, Cuba 1959
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />Professional Surveyor & Mapper Florida (No. LS-2821)
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.)
<br />Member of: National Safety Council; American Congress of Surveying & Mapping; National Society of Professional Land
<br />Surveyorsl; Florida Society of Surveyors & Mappers; Miami-Dade Chapter FSM Society
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Districtwide Engineering & Surveying - FDOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Project Manager 2001-2005
<br /> (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE W Check if project performed with current firm
<br />a. Under this contract, Mr. Gatell supervised 170 different LOAs for the last 7 years. The miscellaneous type projects
<br /> assigned included but not limited to, establishment of baselines, reference points, bench marks, cross sections,
<br /> topographical features, DTM, GPS and monumentation for FDOT right of ways and control maps. Currently, FRA is
<br /> providing managerial assistance to the Department in the management of other consultants' survey contracts.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Design/Build Limited Access ROW Fencing in Clay County - FDOT 2 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Project Surveyor 2004-2005
<br />b. (3) BRIEF DESCRIPTION (Brie' scope. size. cost, etc.) AND SPECIFIC ROLE ,~ Check if project performed with current firm
<br />Mr. Gatell will serve as the Project Surveyor. This is a Design Build project for fencing the SR 23 (Branan Field Chaffee
<br /> Road) Limited Access Right of Way from SR 21 (Blanding Blvd.) northward to 300 feet north of Kendlewood drive at Clay
<br /> County. Fence line staking and minor roadway improvements will also be provided. Involves control, design, right of way
<br /> and construction surveying.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miscellaneous Intersection Improvements - Orange County (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Project Surveyor 2004
<br />c. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />FRA provided miscellaneous surveys and utility locates at the following locations in Orange County: McCulloch Road,
<br /> Dean Road with Lake Georgia Drive, Chickasaw Trail, Millinockett Lane, Lake Underhill Road, Golden Rod Road.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Emerson Ave from Indrio Rd to Indian River County Line - FDOT 4 (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Surveyor 2003
<br />d. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />This contract included a full design survey of 2.5 miles, the establishment of a control network, recovery of historical
<br /> baseline and full topo and DTM from the center of the existing canal to the east right of way of SR 607.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miami Intermodal Center (MIC) - FOOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Survey Task Leader 2004 - 2005
<br />e. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Mr. Gatell serves as the Survey Task Leader for this contract which involves surveying, mapping, utility designating, utility
<br /> locating of the existing surface and subsurface utilities to support the three design consultants for the MIC under contract
<br /> to FOOT.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|