Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />12, NAME <br />Fernando Z. Gatell, PSM <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13, ROLE IN THIS CONTRACT <br />Project Surveyor & Mapper a TOTAL <br />35 + <br /> <br />14, YEARS EXPERIENCE <br />I b WTH CURRENT FIRM <br />18 <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />F.R. Aleman & Associates, Inc. (Miami, Orlando, Lake Worth, Tampa, Jacksonville & Tallahassee, Florida) <br /> <br />16 EDUCATION (DEGREE AND SPECIALlZA nON) <br />BD <br />Surveying Camaguey School, Cuba 1965 <br />BS <br />Surveying Ciego de Avila, Cuba 1959 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Professional Surveyor & Mapper Florida (No. LS-2821) <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.) <br />Member of: National Safety Council; American Congress of Surveying & Mapping; National Society of Professional Land <br />Surveyorsl; Florida Society of Surveyors & Mappers; Miami-Dade Chapter FSM Society <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Districtwide Engineering & Surveying - FDOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Manager 2001-2005 <br /> (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE W Check if project performed with current firm <br />a. Under this contract, Mr. Gatell supervised 170 different LOAs for the last 7 years. The miscellaneous type projects <br /> assigned included but not limited to, establishment of baselines, reference points, bench marks, cross sections, <br /> topographical features, DTM, GPS and monumentation for FDOT right of ways and control maps. Currently, FRA is <br /> providing managerial assistance to the Department in the management of other consultants' survey contracts. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Design/Build Limited Access ROW Fencing in Clay County - FDOT 2 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Surveyor 2004-2005 <br />b. (3) BRIEF DESCRIPTION (Brie' scope. size. cost, etc.) AND SPECIFIC ROLE ,~ Check if project performed with current firm <br />Mr. Gatell will serve as the Project Surveyor. This is a Design Build project for fencing the SR 23 (Branan Field Chaffee <br /> Road) Limited Access Right of Way from SR 21 (Blanding Blvd.) northward to 300 feet north of Kendlewood drive at Clay <br /> County. Fence line staking and minor roadway improvements will also be provided. Involves control, design, right of way <br /> and construction surveying. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miscellaneous Intersection Improvements - Orange County (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Project Surveyor 2004 <br />c. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />FRA provided miscellaneous surveys and utility locates at the following locations in Orange County: McCulloch Road, <br /> Dean Road with Lake Georgia Drive, Chickasaw Trail, Millinockett Lane, Lake Underhill Road, Golden Rod Road. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Emerson Ave from Indrio Rd to Indian River County Line - FDOT 4 (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Surveyor 2003 <br />d. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />This contract included a full design survey of 2.5 miles, the establishment of a control network, recovery of historical <br /> baseline and full topo and DTM from the center of the existing canal to the east right of way of SR 607. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Intermodal Center (MIC) - FOOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Survey Task Leader 2004 - 2005 <br />e. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Mr. Gatell serves as the Survey Task Leader for this contract which involves surveying, mapping, utility designating, utility <br /> locating of the existing surface and subsurface utilities to support the three design consultants for the MIC under contract <br /> to FOOT. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />