Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each kev person.) <br /> <br />NAME: <br />- ROLE IN THIS CONTRACT: <br /> <br />Carlos M. Flores. AlA. NCARB. President <br /> <br />Registered Architect <br /> <br />14a. <br /> <br />YEARS EXPERIENCE - TOTAL: <br /> <br />27 <br /> <br />14b. <br /> <br />YEARS EXPERIENCE - WITH CURRENT FIRM: <br /> <br />3 <br /> <br />16. <br /> <br />EDUCATION (DEGREE AND SPECIALlZA TlON): <br /> <br />CMF INTERNATIONAL GROUP. INC. <br />9300 South Dadeland Blvd. Suite 602. Miami. FL.33156 <br />BArch/Interior Design/General Contractor <br /> <br />15. <br /> <br />FIRM NAME AND LOCATION (Citv and State): <br /> <br />CURRENT PROFESSIONAL REGISTRA TION (STATE AND DISCIPLINE): State of Florida/Architecture/Interior <br />Designer/General Contractor / North Carolina/Architecture <br />OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, A wards, etc.): <br />AWARDS: <br />ORGANIZATIONS: American Institute of Architects - AlA; National Council of Architectural Registration Board- NCARB; <br />Florida Educational Facilities Planner Association-FEFPA; Society of Colleges and University Planners-SCUO; <br />American Association of Airport Executives- AAAE; Airport Consultants Council-ACC <br /> <br />19a( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Brolam, Inc, Warehouse, Hialeah Gardens, Florida <br /> <br />19a(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2007-Architect of Record/ Construction <br />Management <br /> <br />19a(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):- On going- Projected completion on 4/2007 <br />Responsible for Construction Management. <br /> <br />.19a(3) <br /> <br />RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Design/build to rebuild <br />warehouse damaged by Hurricane Wilma. The project consists of the Warehouse which includes Shop Maintenance Facilities. <br />reconstruction of the damaged structure and new structural elements, renovation of 8.356 sq. ft. of interior offices located on a <br />second level, new bathrooms. parking areas both inside and outside the building. The scope includes 2 loading docks area. all in a site <br />of 2.43 acres. Provide code compliance as per Florida Building Code. Accessibility upgrades including additional Elevator for <br />compliance with ADA. Replacement of roof structural deck and re-roofing. Building Area of 39,700 SF- The project cost was <br />$2,219.000. - Architect of Record/ Construction Manager: Responsible for Assessing damages by Hurricane Wilma, Prepare Design <br />and Construction Documents for the Reconstruction of the Warehouse and Offices. <br /> <br />19a(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X <br /> <br />19b(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Southridge Community and Aquatic Center. Phase III <br /> <br />19b(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: To be completed 2008-Cost Estimating, A/OC <br />and Construction Manager <br />19b(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):- On going- Projected completion on 2008 <br /> <br />19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Architecture construction <br />management for the design of a community and Aquatic center. The total structure is 13,369 sq.ft. that will include the community <br />center building with activity rooms, offices' restrooms, lifeguard locker area, snack bar, public bathrooms with showers and locker <br />rooms, aquatic center, covered outdoor seating area, exterior and covered breezeway. The pool area totals 11.977 sq.ft that includes <br />a children's water play pool, a teaching pool, a 25 yard competition pool. A Mechanical Building to house all pool equipment. Site <br />Development that includes parking for the facility. An estimated cost of $5,301,231. <br />CMF is responsible for the Construction Management Services, Cost Estimating, O/A/OC and Construction Administration. <br /> <br />19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X <br /> <br />. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />