Laserfiche WebLink
<br />19k(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State}:Women's Park, Women's History Gallery, Miami-Dade County Park <br />and Recreation, Miami, Florida <br /> <br />. <br /> <br />19k(2) <br /> <br />19k(2) <br /> <br />19kk3) <br /> <br />19k(3) <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2001 - Architect of Record/Project Architect/Designer <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2001 <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The project consisted of a building <br />dedicated to exhibit of prominent women of the community, it included a reception area, a lobby/main exhibit area, a video/projection <br />room, a multipurpose room, food preparation <br />Room, administration work area and the curator's office, storage room for props and exterior storage facility for use of the park <br />maintenance, and the exterior terrace for outdoors functions. Area of 6,000.SF - Project cost of $1,000,000. - Principal in charge: <br />Responsible for surveying the property, preparing a program for the Gallery Committee, selection of building site location, design of <br />building, overseeing the preparation of construction documents, and <br />Construction administration overview of the project. <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: <br /> <br />191(1 ) <br /> <br />191(2) <br /> <br />191(2) <br /> <br />191(3) <br /> <br />191(3) <br /> <br />. <br /> <br />19m(1) <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and State): Miscellaneous Roofing Consultant, Miami International Airport, Miami, <br />Florida <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 -Architect of Record/Principal in Charge <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size. cost etc.) AND SPECIFIC ROLE: Multiple re-roofing, projects for Aviation <br />Dept. buildings: Re-roofing, removal and replacement of electrical and mechanical equipment for: Concourse F; Concourse E Satellite; <br />Bldg.5A (Adm. Chiller Bldg.) - 21,000 SF; Bldg.32 (Chiller System Bldg.) - 16,000 SF; Bldg.60 &60A -100,000SF; <br />Numerous building at a total Cost of $9.5 million dollars - Architect of Record: Responsible for surveying the buildings, overseeing <br />the preparation of contract documents, and providing construction administration overview of the project. <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and State): Royal Palm IShorecrest Crown Plaza Hotel Miami Beach, Florida <br /> <br />19m(2) <br /> <br />19m(2) <br /> <br />19m(3) <br /> <br />19m(3) <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES; 2002 - Architect of Record (Historic Preservation) <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: A 400 bed hotel is a combination of the <br />Restoration of two existing Art Deco hotels and two new towers addition. The developer for The Royal Palm Hotel was allowed to <br />record, demolish and reconstruct to the building to its original likeness. The project included meeting rooms, assembly areas, parking <br />garage and all amenities of a five star hotel would have. The construction cost $63,000,000. - Architect of Record <br />(Historic Preservation): Responsible for recording of all building elevations, floor plans, details. Materials and methods of construction <br />was determined and recorded. Preparation of construction documents and construction administration as it relates to historic <br />preservation. <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: <br /> <br />19n(1) <br /> <br />19n(2) <br /> <br />19n(2) <br /> <br />19n(3) <br /> <br />. <br />19n(3) <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and State):Miami International Airport, GTI Holding 10ts/Taxi Cafeteria, <br />Miami, Florida. <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES:1999 - Architect of Record <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): N/A <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: This project consisted of a <br />Shuttle buses and taxi cab control building, bus terminal shelters, the cafeteria with a full kitchen, loading dock, vending area, <br />rest/dining area, and bathrooms. Project includes Amenities Buildingsl taxi Cab Cafeteria (12,000 SF). Project with a Cost $ 5 Millions <br />- Principal in charge/Architect of Record: Responsible for preparing a program, site planning and coordination of civil engineering for <br />traffic constraints. Design of all amenities, building structures as well as design, overseeing preparation of construction documents and <br />overview of Construction administration of the project. <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: <br /> <br />STANDARD FORM 330 (6/2004) PAGE 6 <br />