My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF International Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
CMF International Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:01 PM
Creation date
8/28/2008 10:57:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I. <br /> <br />. <br /> <br />e <br /> <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Tahir Iqbal, P.E. Project Manager a. TOTAL I b. WITH CURRENT FIRM <br /> 27 17 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Pistorino & Alam Consulting Engineers, Inc. <br /> Miami, Florida 33143 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> University of Michigan, Ann Arbor, Michigan 1983 State of Florida, Florida Registered Professional <br /> Master of Science in Structural Engineer EngineerRegistration PE#: 48061 <br /> N.E.O. Engineering University, Karachi, <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Structural:Structural dynamics, structural analysis, prestressed concrete design, advanced steel and concrete design <br /> and, design of bridge structures, <br /> Computers:Knowledge of computer aided design and drafting (AUTOCAO) and application of structural analysis <br /> computer programs and knowledge of Primavera Program. SAP. 90, ETAB for High Rise Buildings Design. <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Miami Office and Garage PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Project Manager <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Design of six-story building and six-story parking garage preparation of floor plans, structural analysis, design of the <br /> structural systems in compliance with South Florida Building Code. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Axis Condominium Buildings PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Project Manager <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Structural Design Criteria for two 40 stories condominium towers and eight story parking garage. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Baptist Hospital Parking Garage and Dietary Expansion Project, PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida Project Manager <br />c. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Provided design criteria and construction phase services for the parking garage. Existing court-yeard of the cafeteria <br /> will be enclosed by a new structure. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Onyx 1 - Condominium Building PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Project Manager <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Provided design criteria and construction phase services for the condominium building and parking garage, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Project Manager <br />e, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> The desing of all on-site and off-site improvements including a new internconnect fire water main servicing the local <br /> public areas adjacent to the South Miami Metro Rail Station. <br /> <br />STANDARD FORM 330 (6/2004) Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.