Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />. <br /> <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Nasir M. Alam, P.E. Principal-In-Charge a. TOTAL I b. WITH CURRENT FIRM <br /> 26 26 <br />15 FIRM NAME AND LOCATION (City and State) <br /> Pistorino & Alam Consulting Engineers, Inc., Miami, Florida <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> University of Miami, Coral Gables and Florida International Florida Registered Professional Engineer <br /> University, Miami- Graduate level courses including State of Florida P.E, Number 36954 <br /> Advanced Structural Analysis, Reinforced Concrete Design, Structural Engineering 1 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Past president and one of the pioneers of Florida Structural Engineers Association (FSEA). <br /> Past Vice president of Florida Structural Engineers Association (FSEA) <br /> Past President of the Florida Engineering Society (FES), Miami Chapter. <br /> Past Vice-President of the Florida Engineering Society (FES), State Level. <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Miami Office and Garage PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Principal n/a <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm <br /> Design of six-story building and six-story parking garage preparation of floor plans, structural analysis, design of the <br /> structural systems in compliance with South Florida Building Code. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Principal n/a <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm <br /> The desing of all on-site and off-site improvements including a new internconnect fire water main servicing the local <br /> public areas adjacent to the South Miami Metro Rail Station. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Axis Condominium Buildings PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Principal n/a <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm <br /> Structural Design Criteria for two 40 stories condominium towers and eight story parking garage, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Baptist Hospital Parking Garage and Dietary Expansion Project, PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida Principal n/a <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm <br /> Provided design criteria and construction phase services for the parking garage. Existing court-yeard of the cafeteria <br /> will be enclosed by a new structure. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Miami Police Station, South Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Principal n/a <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed With current firm <br /> Structural and Civil Engineerign design of major addition to the existing Police Station of City of South Miami, <br /> <br />STANDARD FORM 330 (6/2004) Page 2 <br />