<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />Rudy M. Ortiz, P.E., President
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Managing Principal
<br />
<br />14, YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />20 6
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. - Miami, Florida (Headquarters)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />B.S., (Civil Engineering) 1983; University of New York
<br />
<br />Professional Engineer - FL, NY
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc)
<br />American Water Works Association (A WW A)
<br />Florida Engineer Society (FES)
<br />National Society of Professional Engineers (NSPE)
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miramar Roadway Infrastructure Project: Miramar, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> N/ A 2007
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X ] Check If project performed with current firm
<br /> Principal providing services in construction management and construction inspection for activities throughout the southern
<br /> hal f of the City of M iramar. The project consists of the installation of all the water, sewer and drainage, as well as the
<br /> construction of a lift station and over 5 miles of roadway resurfacing.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FEMA-DORM Stormwater Reduction Program, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Florida 2006 2006
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ X] Check if project performed with current firm
<br /> Project Manager for the $400 million stormwater and drainage reduction program, overseeing a staff of resident engineers,
<br /> senior inspectors and inspectors.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Infiltration/Exfiltration/lntlow Program: Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2001 2001
<br /> (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc) AND SPECIFIC ROLE [X] Check If project performed with current firm
<br />C. Program manager for the $250 million Infiltration/Exfiltration/lnflow Program in Miami-Dade County, Florida. Mr. Ortiz
<br /> was responsible for leading a staff of engineers, construction managers, inspectors, consultants and other professionals in the
<br /> construction of system wide sanitary sewer improvements.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> New York City Department of Environmental Protection, New York PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Citv, NY 1997
<br /> (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE [ ] Check If project performed with current firm
<br />d. Project Manager responsible for the construction management of a $15 million, 50,000 feet of water distribution lines in New
<br />York City, ranging from 8-inch to 48-inches in diameter, including reconstruction and installation of water and wastewater
<br /> service laterals. Mr. Ortiz' duties included contract administration, review and approval of change order, shop-drawing
<br /> review, specification review, approval of progress payments, and supervision of full-time on-site field engineers and
<br /> inspectors. This work also involved the supervision of street resurfacing and overlays, sidewalk improvements, street
<br /> markings and lighting
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Pump Station Improvement Program, Miami-Dade Water and sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> DeDartment: Miami-Dade County, Florida 1999 1999
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X] Check If project performed With current firm
<br />e. Program manager for the Planning, Designing, and Engineering group on Miami-Dade County's $250 million Pump Station
<br /> Improvement Program, as part of the County's $1 billion Program Management Team. Mr. Ortiz directed the activities of
<br /> assistant program managers, and other Senior Engineers, in the planning, design, permitting, construction administration, and
<br /> certification of more than 600 pump stations and 100 miles of force mains.
<br />