Laserfiche WebLink
<br />- <br /> <br />_ <br /> <br />e <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br />Rudy M. Ortiz, P.E., President <br /> <br />13. ROLE IN THIS CONTRACT <br />Managing Principal <br /> <br />14, YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />20 6 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. - Miami, Florida (Headquarters) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />B.S., (Civil Engineering) 1983; University of New York <br /> <br />Professional Engineer - FL, NY <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) <br />American Water Works Association (A WW A) <br />Florida Engineer Society (FES) <br />National Society of Professional Engineers (NSPE) <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miramar Roadway Infrastructure Project: Miramar, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> N/ A 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X ] Check If project performed with current firm <br /> Principal providing services in construction management and construction inspection for activities throughout the southern <br /> hal f of the City of M iramar. The project consists of the installation of all the water, sewer and drainage, as well as the <br /> construction of a lift station and over 5 miles of roadway resurfacing. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FEMA-DORM Stormwater Reduction Program, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida 2006 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ X] Check if project performed with current firm <br /> Project Manager for the $400 million stormwater and drainage reduction program, overseeing a staff of resident engineers, <br /> senior inspectors and inspectors. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Infiltration/Exfiltration/lntlow Program: Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2001 2001 <br /> (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc) AND SPECIFIC ROLE [X] Check If project performed with current firm <br />C. Program manager for the $250 million Infiltration/Exfiltration/lnflow Program in Miami-Dade County, Florida. Mr. Ortiz <br /> was responsible for leading a staff of engineers, construction managers, inspectors, consultants and other professionals in the <br /> construction of system wide sanitary sewer improvements. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> New York City Department of Environmental Protection, New York PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Citv, NY 1997 <br /> (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE [ ] Check If project performed with current firm <br />d. Project Manager responsible for the construction management of a $15 million, 50,000 feet of water distribution lines in New <br />York City, ranging from 8-inch to 48-inches in diameter, including reconstruction and installation of water and wastewater <br /> service laterals. Mr. Ortiz' duties included contract administration, review and approval of change order, shop-drawing <br /> review, specification review, approval of progress payments, and supervision of full-time on-site field engineers and <br /> inspectors. This work also involved the supervision of street resurfacing and overlays, sidewalk improvements, street <br /> markings and lighting <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pump Station Improvement Program, Miami-Dade Water and sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> DeDartment: Miami-Dade County, Florida 1999 1999 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X] Check If project performed With current firm <br />e. Program manager for the Planning, Designing, and Engineering group on Miami-Dade County's $250 million Pump Station <br /> Improvement Program, as part of the County's $1 billion Program Management Team. Mr. Ortiz directed the activities of <br /> assistant program managers, and other Senior Engineers, in the planning, design, permitting, construction administration, and <br /> certification of more than 600 pump stations and 100 miles of force mains. <br /> <br />STANDARD FORM 330 (6(2004) PAGE 1 <br />