Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br />Jose A. Com pres, P.E., Project Engineer <br /> <br />13. ROLE IN THIS CONTRACT <br />Structural Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />11 4 months <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. - Miami, Florida (Headquarters) <br />16. EDUCATION (DEGREE AND SPEC/ALlZA nON) <br />B.S., (Civil Engineering), Pontifica Universidad Catolica <br />Madre y Maestra, 1994 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Professional Engineer - FL- Structural/Civil <br /> <br />MBA, (Civil Engineering), Pontifica Universidad Catolica <br />Madre y Maestra, 200 I <br /> <br />Accounting Technology, Universidad Oominicana O&M, 1996 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Project Manager, Miami Dade Waste Water Master Plan, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> Water & Sewer Department, Florida 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check il project performed With current firm <br />a. Mr. Compres as Project Manager is currently providing services in an effort to develop Remedial Action Plans for <br /> approximately 350 Pump Stations. Mr. Compres has worked very diligently with the staff to create the inspection criteria. <br /> This information retrieved from the field will is critical in developing the Remedial Action Plan. This information will help <br /> upgrade each individual pump station and make them compliant with the 1 O-Hr operating criteria. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> General Director, Conemco Engineering Dominican Republic PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check il project performed with current firm <br /> - Contractor of Santiago de Los Caballeros Water and Sewer Department (CORAASAN) including: sewer lines, water <br /> mains, concrete manholes for 52 inches water conduction lines. <br />b. - Project management of more than 20 Condomium projects in the City of Santiago, Dominican Republic. <br /> - Project management on a 38 hectares land development project including potable mains, earthwork, streets, culverts, <br /> canalization, surveying and permitting. <br /> - Structural design for: More than 200 projects among them: Two story houses, four Floor masonry and concrete <br /> buildings, water deposits, pools, contention walls, steel trusses, pedestrian bridge, parking lots, etc. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Project Engineer, Corporacion de Asfalto, Dominican Republic PROFESSIONAL SERVICES 1 CONSTRUCTION (II applicable) <br /> 1998 <br /> (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check II project performed with current firm <br /> - Project management for a 30 Kilometers mountainous roadway (Villa Bao- La Cuesta. San Jose De Las Matas, Santiago, <br />c. Dominican Republic.) including technical control of materials, equipment and optimization. <br /> - Project Management of an Airport runway Rehabilitation. (Aeropuerto Internacional del Cibao), 1997. Earthwork, <br /> equipment control, specification and budget control. <br /> - Project Management of Playa Oorada Golf Club (Puerto Plata, Dominican Republic). Rehabilitation of all roads of the <br /> complex. Including earthwork, drainage, paving and grading control. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Water Distribution Department Director, Santiago, Dominican Republic PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) <br /> 1995 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check il project performed with current firm <br />d. -Director of a 600,000 people Water Distribution system, with 12 distribution Tanks, 8 Pump stations, 2 water treatment <br /> plants. Coordinate and control the appropriate operation, continuous service, maintenance, repairs, with the minimum loss. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Field Engineer, Santiago, Dominican Republic PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 1994 <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />