Laserfiche WebLink
<br />- <br /> <br />e <br /> <br />_ <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check If project performed with current firm <br />Managed construction sites and crews for different tasks in the construction for 2,000 people, 150,000 SF Theater (Teatro <br />Regional Del Cibao). <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />