My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF International Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
CMF International Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:01 PM
Creation date
8/28/2008 10:57:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />. <br /> <br />. <br /> <br />Mr. Caraballo provided project management services in monitoring the construction activities throughout the southern half of <br />the City of M iramar. The project consisted of the installation of all the water, sewer, and drainage, as well as the expansion of <br />a lift station and roadway resurfacing. Mr. Caraballo performed quality assurance reviews of the inspectors daily reports. <br /> <br />f. <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Project Manager, NW 12th Avenue Construction Trailer Complex: PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Miami, Florida 2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Mr. Caraballo has completed the design and permitting for a 5,053.12 S.F. trailer complex. The trailers were needed for the <br />construction activities related to the widening of FOOT's NW 12th A venue Bascule Bridge. The design consisted of paving, <br />grading, drainage, water, sewer, and electrical plans. <br /> <br />g. <br /> <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Project Manager, New 8-inch DIP Water Main Extension for the Miami- PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Dade County Water and Sewer De artment (W ASD): Miami, Florida 2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE [ X] Check if project performed with current firm <br />Mr. Caraballo has completed the planning and design of over 3,000 feet of 8-inch water distribution pipeline for the Miami- <br />Dade Water and Sewer Department. Mr. Caraballo was responsible for quality control and project coordination with the <br />Master Consultant, W ASO, and permitting agencies. Additional responsibilities included project activities scheduling, <br />preparation of engineering cost estimates, and coordination with other stakeholders. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.