|
<br />-
<br />
<br />.
<br />
<br />.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />Srikanth V. Gajula, E.I., Project Engineer
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />
<br />3
<br />
<br />3
<br />
<br />15. FIRM NAME AND LOCATION (Citrand State)
<br />CES Consultants, Inc. - Miami, Florida (Headquarters)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />M.S., (Civil Engineering) 2004; Florida International
<br />University
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />B.S., (Civil Engineering) 2002, Osmania University,
<br />Hyderabad, India
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />I nstitute of Transportation Engineers
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SW 27th Ave SW 27th Ave Roadway Reconstruction, Miami Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Florida. 2007
<br /> (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check If project performed with current firm
<br /> Mr. Gajula as a Project Engineer is currently providing engineering analysis and design services for a closed storm water
<br />a. drainage system along SW 27th A venue between South Dixie Highway and South Bayshore Drive. The project consists of
<br /> widening this stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered are the
<br /> elevation changes throughout the stretch of roadway and the amount of utilities located throughout this old corridor. The
<br /> team has worked diligently to provide a technically sound and cost effective design that incorporates all of the client's
<br /> requirements and needs.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miami Dade Waste Water Master Plan, Miami-Dade Water & Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Department, Florida 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed With current firm
<br />b. Mr. Gajula as a Project Engineer is currently providing engineering services in an effort to develop Remedial Action Plans
<br />for approximately 350 Pump Stations. The recommended upgrades will ensure compliance with the I O-hour run time per day
<br /> limit criteria. This task evaluates all aspects of the pump stations, identify deficiencies and provide necessary
<br /> recommendations for improvements which then be evaluated on a system wide basis. A cost analysis for the deficient pump
<br /> stations is also provided in this task.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Assistant Project Manager, Sidealk Improvements, Traffic Signal and PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> School Flashing inspection Project: Miami-Dade County, Florida N/ A 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
<br />C. As Project Engineer, Mr. Gajula coordinated construction and inspection activities, performed field inspections, reviewed the
<br /> daily quantities constructed by the contractor and resolved complaints. He also provided QA/QC to the inspections performed
<br /> by the inspectors.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Project Engineer, GOB Sidewalk Improvement Project: Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> County, Florida N/A 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check If project performed with current firm
<br />d. As a Project Engineer, Mr. Gajula was responsible for the management of construction operations, including supervision of
<br /> all construction activities, project administration, quality assurance, project cost control and scheduling. His duties also
<br /> include the preparation of reports, project coordination with sub-consultants, participates in weekly project meetings with the
<br /> client. He also recommends project strategies, programs and resource allocation including staffing and budgeting to meet the
<br /> organization .goals.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Project Engineer, FEMA-DORM Drainage Installation and Roadway PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Improvements Proiect: Miami-Dade County, Florida 2006 2006
<br />
<br />STANDARD FORM 330 (6(2004) PAGE 6
<br />
|