Laserfiche WebLink
<br />e <br /> <br />_ <br /> <br />. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( X I Check if project performed with current firm <br />As Project Engineer, Mr. Gajula carried out construction of roadway improvement, drainage, roadway resurfacing and <br />reconstruction. Mr. Gajula's responsibilities included the implementation of maintenance of traffic (MOT) plans, <br />coordination with other agencies, county personnel, and community residents. His duties also comprised of multiple tasks <br />including review of design layouts and construction reports prepared by qualified inspectors and several contractors to <br />determine whether content was sufficient to meet design requirements; he performed review and quality control of design <br />packages, construction documents including billing documentation eliminating discrepancies to allow reimbursement to <br />Miami-Dade Count from the Federal Emer enc Mana ement A enc (FEMA). <br /> <br />STANDARD FORM 330 (6(2004) PAGE 7 <br />