Laserfiche WebLink
<br />- O. <br /> E. <br /> F. <br /> G. <br /> 23a. <br /> 23b. <br /> 23c. <br /> 24. <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as manv projects as requested bV the agencv, or 10 projects, if not specified. <br />Complete one Section F for each project. <br />EXAMPLE PROJECT KEY NUMBER: 2 <br /> <br />TITLE AND LOCATION (CitV and State): Southridge Community and Aquatic Center, Phase III. Miami, Florida <br /> <br />YEAR COMPLETED - PROFESSIONAL SERVICES: Completed 2007- Cost Estimatesl Q/A-C/A/Construction Management <br /> <br />YEAR COMPLETED - CONSTRUCTION (If applicable): Expected Completion 2008-Q/A-Q/C- Construction Management <br /> <br />PROJECT OWNER'S INFORMATION - PROJECT OWNER: Miami-Dade County Park & Recreation <br /> <br />PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: Mr. Guillermo Garcia, P.M. <br /> <br />PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: (305) 775-7815 <br /> <br />BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br />Architecture construction management for the design of a community and Aquatic center. The total structure is 13,369 <br />sq.ft. that will include the community center building with activity rooms, offices' restrooms, lifeguard locker area, snack <br />bar, public bathrooms with showers and locker rooms, aquatic center, covered outdoor seating area, exterior and covered <br />breezeway. The pool area totals 11,977 sq.ft that includes a children's water play pool, a teaching pool, a 25 yard <br />competition pool. A Mechanical Building to house all pool equipment. Site Development that includes parking for the <br />facility. An estimated cost of $5,301,231. <br />CMF is responsible for the Construction Management Services, Cost Estimating, Q/A/QC and Construction Administration. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT: X <br /> <br />(1) FIRM NAME (2) FIRM LOCATION (CitV and State (3) ROLE <br />CMF INTERNATIONAL GROUP,INC. Miami, Florida Cost Estimatesl Q/A-Q/CI <br /> Construction Management <br /> <br />. <br /> <br /> <br />............,..,.".......-. ~~. <br /> <br />.OUIIIRIlXiE COMMu/>.ny A/>.D AqJJAIR CI./>.II.R <br /> <br />MIAM.I. FLORJDA <br /> <br />STANDARD FORM 330 (6/2004) PAGE 13 <br />