My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF International Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
CMF International Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:01 PM
Creation date
8/28/2008 10:57:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- O. <br /> E. <br /> F. <br /> G. <br /> 23a. <br /> 23b. <br /> 23c. <br /> 24. <br /> <br />F.XAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />. <br /> <br />25 <br /> <br />EXAMPLE PROJECT KEY NUMBER: 1 <br /> <br />TITLE AND LOCATION (City and State): Homestead Air Reserve Park, Homestead, Florida <br /> <br />YEAR COMPLETED - PROFESSIONAL SERVICES: 2003 - Sr. Project Manager / Designer <br /> <br />YEAR COMPLETED - CONSTRUCTION (If applicable): 2003 <br /> <br />PROJECT OWNER'S INFORMATION - PROJECT OWNER:-Miami-Dade County, Department of Park and <br />Recreation <br /> <br />PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: Ms. Adelfa Martinez <br /> <br />PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: (305) 775-7815 <br /> <br />BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br />Architectural/Engineering Services for a Regional Park. The scope of services included the utilities master plan <br />for the park, the scope verification of the master plan, the design of Recreation Field Center, multiple soccer <br />fields with bleachers, multiple baseball fields, fields to include lighting and irrigation, picnic shelters, <br />restrooms/storage building, three parking lots with 268 parking spaces in total, and pathways. Project <br />Manager for the County Adelfa Martinez. This project is currently Ongoing and design phase was just been <br />completed. The construction cost of Phase I for this project was estimated to be $4,530,000.00, with the <br />overall construction cost for all Phases at $ 40,000,000 dollars. Sr. Project Manager responsible for Site <br />planning and coordination with civil engineering for all utilities and traffic constraints. Design two picnic <br />shelter buildings, a Community Field House, two lit football/soccer fields and parking area for two hundred <br />sixty four cars. Responsible for the oversight of construction documents preparation, the coordination of all <br />engineering tears, and provide the construction administration overview of the project. <br /> <br />FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT: <br /> <br />(1) FIRM NAME <br />CMF INTERNATIONAL GROUP,INC. <br /> <br />(2) FIRM LOCATION {City and State (3) ROLE <br />Miami, Florida Architecture / <br />Construction Mana ement <br /> <br /> <br />. <br /> <br />1/ <br />r <br />l <br /> <br />II()MI'~II'Al)AIR RrSIR\'r PARK. <br /> <br />IIOMI:STI'AD, FLORI DA <br /> <br />STANDARD FORM 330 (6/2004) PAGE 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.