Laserfiche WebLink
<br />12. NAME <br />Vincent 0, Varina. P.G, <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke erson, <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br /> <br />14. YEARS EXPERIENCE 28 <br /> <br />a. TOTAL <br /> <br />15 <br /> <br />b. WITH CURRENT FIRM <br />8 <br /> <br />FIRM NAME AND LOCATION (City and State) <br /> <br />Langan Engineering H Environmental Services. Inc.. Miami. Florida <br /> <br />IS. EDUCATION (DECREE AND SPECIALIZATION) <br />Pennsylvania StatB University, 8S in Earth SciBncB, 1992 <br />Orexel University, /.is in Engineering Geology,1998 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Profmional Geologist in Florida (No. 20m and PBnnsylvania (No. 32S0-E) <br />CertifiBd Florida Environmental Amssor (No. 248) <br />limsBd EnvironmBntal Professional (No, 73) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Deering Bay Country Club - Hydrogeologic Services <br />Coral Gables, Florida <br /> <br />a. <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing NIA <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. <br />The project consisted of a forensic investigation to determine why two lake lowering discharge wells were not operating at capacity. The system <br />consisted of pumping from on-site lakes into the drainage wells. The investigation included reviewing and interpreting geologic logs, evaluating well <br />construction logs, collecting and evaluating hydrologic data for the on-site ponds and Biscayne Bay. Langan conducted a hydrogeologic investigation <br />to determine suitable zones for injection of untreated lake water and a surface water investigation to determine water quality of the discharged lake <br />water. As part of the permitting of this well, Langan is currently conducting a hydrogeologic investigation to determine the lateral continuity of a semi- <br />confining layer above the untreated production zones. Mr, Yarina managed all aspects of this project. and provided technical review and professional <br />certifications for finished work products. His work on this project has allowed the client to realize a significant cost savings in water treatment and <br />avoid otentiallon -term fines for violation of Florida Statutes. The cost of the ro'ect is $45,000 and is on oin . <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Residences at Atlantic East - Hydrogeologic Evaluation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Pompano Beach, Florida 2005 2006 <br /> <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. <br />Langan evaluated a hydrogeologic investigation conducted by Jaffer Associates to provide a Reasonable Assurance Report to satisfy the <br />requirements of Chapter 62-528, Florida Administrative Code (FAC), for permitting of Class V, Group 6 underground injection control wells for deep <br />injection of stormwater runoff. Langan's evaluation of the water quality and geological data collected from a 200 ft deep test hole indicated that deep <br />well injection could not be accomplished until 140 ft bls. Mr. Yarina managed all aspects of this project, and provided technical review and <br />rofessional certifications for finished work roducts. The cost of the com leted ro'ect was a roximatel $5,000. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> <br />200 Las Olas Circle - Hydrogeologic Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Fort Lauderdale, Florida 2006 ongoing <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. <br />Langan conducted a hydrogeologic investigation to collect data to provide a Reasonable Assurance Report to satisfy the requirements of Chapter <br />62-528, Florida Administrative Code (FAC), for permitting of Class V, Group 6 underground injection control wells for deep injection of stormwater <br />runoff. Langan supervised the logging of a 150ft-deep test hole using geophysical techniques (induction conductivity, neutron, and gamma-gamma) <br />and Standard Penetration Test data and the collection of water quality using a "real-time" rotary method. An evaluation of the geophysical. <br />geotechnical and water quality data indicated that 105 ft below land surface (bls) was suitable for injection and meet the intent of the Chapter 62-528. <br />FAC requirements. Mr. Yarina managed all aspects of this project. and provided technical review and professional certifications for finished work <br />roducts. <br /> <br /> <br />c. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Turnberry Ocean Colony Site, Sunny Isles Beach, Florida <br /> <br />d. <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />1995-1996 Unknown <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm. <br />Performed a Phase II ESA for contiguous vacant parcels of land that formerly contained low-rise motels. Investigated an on-site concern regarding <br />soil staining and an off-site concern relating to potential migration of a groundwater contamination plume originating from a nearby dry cleaner. The <br />Phase II consisted of the construction of three wells (2 shallow and 1 deep double-case well) and sampling and testing the soil-groundwater for <br />chlorinated and petroleum-based compounds. Petroleum contaminated soil and groundwater was identified in the stained soil area. Provided <br />recommendations and cost-estimates for erformin ro er assessment and otentia! remediation of the concern. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Palm Beach Aggregates, Palm Beach County, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2002-2003 NA <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. <br />The project consisted of performing a Phase I and Phase II Environmental Site Assessments (ESA) for the SFWMD at a 1300-acre limestone mining <br />quarry and sod farm, The project is one of the "cornerstone" projects of the Comprehensive Everglades Restoration Plan (CERP), The limestone <br />rock mines were extremely low in permeability which will allow their use for surface water storage for billions of gallons of water for future supply <br />purposes, Mr. Yarina developed and supervised implementation of the scope of work for assessment of the entire property which included historical <br />research, site reconnaissance, soil. sediment. surface water and groundwater sampling, Recommendations for further assessment were provided. <br />Based on the work erformed. the SFWMD urchased the land for more than $150,000. <br /> <br />STANDARD FORM 330 6/2004 PAGE 2 <br />