Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person. <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Daniel R, Grenier, ~1.E,S, Permitting, Mitigation/Restoration, Monitoring, Field Investigations, Statistical a TOTAL I b WITH CURRENT FIRM <br /> and Geographical Analysis 8 2 <br />15. FIRM NAME AND LOCATION (City and State) Langan Engineering 0 Environmental Services, Miami Lakes, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> University of Pennsylvania; N/A <br /> M,E.S. Environmental Biology, 2001 <br /> B.A. Environmental Science; Biology <br /> Concentration, 20m <br /> Wharton School of Business, Minor; Organization and <br /> Environmental Management. 20m <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Publication: A How-To Guide for the Siting and Design of Constructed Wetlands for Use in Stormwater Management and Nonpoint Source Pollution Mitigation Strategies in New Jerseys Watershed <br />Management Area 18 and the Coastal Plain Region. (Sponsored by the Delaware Valley Regional Planning Commission.) <br />Droanizations: Society of Wetland Scientists and American Water Resources Association <br />Trainino: Florida Statewide Wetland Delineation Training (Chapter 62-340); Florida Wetland Plant Identification Training (Richard Chinn Environmental Training); 38.Hour Army Corps of Engineers <br />Wetland Delineation and Management Training Program; 3D-Hour OSHA General Industry; Six Sigma Management Training. <br /> 19, RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Main Street Development. Fort Myers, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. <br />a. New construction of a residential community on an approximately 38.D-acre former agricultural site. Project responsibilities included: Nutrient loading analysis; state and federal <br /> wetland permitting: UMAM assessment: coordination of off-site mitigation requirements with a local mitigation ban~ GIS analysis; regulatory meetings; and project coordination <br /> meetings. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sun 'n lake, Sebring, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. <br />b. New construction of a residential community on an approximately 7.200-acre undeveloped site, Project responsibilities included: State and federal wetland permits review and <br /> compliance: new federal wetland permits: groundwater level testing; installation of soil borings: determination of Seasonal High Water Table: GIS analysis: regulatory meetings: and <br /> proiect coordination meetinQs. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Ventanas, Homestead, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> 2006 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. <br />C. New construction of a residential community on an approximately 30.0-acre former agricultural site. Project responsibilities included: State, <br /> county, and federal wetland permits compliance; Army Corps Jurisdictional Determination challenge; wetland mitigation assessment <br /> (UMAM); coordination with local mitigation bank; GIS analysis; soil sampling for determination of isolated wetland locations; regulatory <br /> meetinos; and proiect coordination meetinos. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Border Patrol at Oania Beach, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Ongoing <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. <br />New construction of a Homeland Security facility on a 4.346-acre site near the Hollywood - Fort Lauderdale International Airport. <br /> Project responsibilities included: Wetland delineation, county and federal wetlands permitting, wetlands mitigation assessment, <br /> Phase I Environmental Site Assessment, and project coordination meetings. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> The Shoppes at Coconut Creek, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. <br />e. New construction of a Lifestyle Community Center on an approximately 20.0-acre former agricultural site. Project responsibilities <br /> included: Wetland delineation, county and federal wetlands permitting, wetland mitigation assessment, and project coordination <br /> meetings. <br /> STANDARD FORM 330 (6/2004) PAGE 2 <br />