My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF International Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
CMF International Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:01 PM
Creation date
8/28/2008 10:57:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />. <br /> <br />. <br /> <br />Examvle Pro;ect Kev No.5 <br /> <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. 02-139 <br /> Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and Slale) 22, YEAR COMPLETED <br /> South Miami Medical Office Building PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Structural Services N/A <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CONTACT NAME I c. POINT OF CONTACT TELEPHONE NUMBER <br /> Baptist Hospital - MGE Architects Peter Goicuria 305-444-0413 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br /> This office provided design and construction phase services for the parking garage at South Miami Hospital. This five <br /> story-parking garage has 680 parking spaces with the option of a five story extension on top. We performed Value <br /> Analysis & Life Cycle Costing for this structure. The total cost of the project was 5.3 million dollars. This project was <br /> completed two months prior to the scheduled completion time and was under budget. Construction cost for this parking <br /> garage was below 7,500.00 per parking space, <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE <br />a. Pistorino & Alam Consulting 7171 SW 62nd Avenue Structural Engineers <br /> Engineers, Inc. Miami, Florida <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE <br />c. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE <br />d, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.