Laserfiche WebLink
<br />Example Project Kev No.7 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br /> <br />e' <br />21. <br /> <br />EXAMPLE PROJECT KEY NUMBER: 1 <br /> <br />TITLE AND LOCATION (City and State): South Pointe Park, Miami Beach, Florida <br /> <br />22a, <br /> <br />YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 <br /> <br />22b. <br /> <br />YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />23a. PROJECT OWNER: City of Miami Beach <br />23b, POINT OF CONTACT NAME: Nuri Menicucci <br /> <br />23c. POINT OF CONTACT TELEPHONE NUMBER: 305673-7071 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost): <br /> <br />South Point Park is designed as a dramatic, ecologically sensitive park at the <br />south end of Miami Beach. The design is programmed to accommodate both <br />active and passive recreation, with play fields, dune, and hammock zones, a <br />playground, and a 20 ft. wide baywalk. An important goal in the Master Plan <br />process was to integrate the park into the urban fabric of the city by <br />strengthening and improving the two major street axes which penetrate the <br />park space. SMDS provided consultation for masterlsite planning, paving <br />materials and site furniture selection, and was the primary landscape <br />architect for the park's planting and irrigation improvements. The fast-track <br />design process began with Master Planning in April 2005, construction a.. <br />documentation is complete, and the park completion is scheduled for March <br />of 2008. <br /> <br />Project Cost: $20,000,000 <br /> <br /> <br />. <br /> <br />Services: Master Planning, Planting & Irrigation Improvements, Construction <br />Phase Services. <br /> <br />Courtesy of Hargreaves & Associates <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Savino & Miller Design Studio North Miami, Florida Local Landscape Architects <br />Coastal Systems Coral Gables, Florida Marine & Civil Engineering <br />Ken Di Donato Fort Lauderdale, Florida Irrigation Consultant <br /> <br />e <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br />