<br />Shahin Hekmat, P. E.
<br />
<br />Civil Engineer
<br />
<br />15 FIRM NAME AND LOCATION (Cily and Slalel
<br />Eisman & Russo, Inc. (Davie, FL)
<br />
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON)
<br />B.S., Civil Engineering, University of Miami, Coral Gables
<br />
<br />17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />Professional Engineer, Florida #49941
<br />
<br />18 OTHER PROFESSIONAL QUALIFICATIONS (PublicatIOns Orqanizations. Tr.1lmnq. Awards. elc.)
<br />· FES/FICE Leadership Institute - 2006 . Advanced Work Zone Traffic Control
<br />
<br />· FES Stormwater Management Design . Florida Engineering Society
<br />
<br />· FDEP NPDES Design Course . FICE CLEC
<br />
<br />· Nan Society of Professional Engineers
<br />· FL Assoc. of Special District Engineers
<br />· American Water Works Association
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> 11\ TITI F ANn I Or:ATION (r:llv Anrl StAte I I '"' V" AD rmAPI "T""
<br /> Consulting Engineering Services PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> (Various Municipalities in South Florida) 1990-2007
<br /> (3) BRIEF DESCRIPTION (Bnel scope. size. cost, elc.) AND SPECIFIC ROLE -.J Check if proiect performed with current frrm
<br /> Served as City Engineer for City of Weston, Consultant Engineer for the City of Sunny Isles Beach and North Lauderdale and
<br />a. District Consultant for South Broward Drainage District, Indian Trace Development District, Bonaventure Development District
<br /> and North Lauderdale Water Control District. Responsibility included review and approval of all new developments within the
<br /> agency boundary, working with staff to identify all improvement projects, prepare preliminary construction cost estimate, and
<br /> attend Commission/Board of Supervisors meetings. Supervise the preparation of plans and specifications for all projects,
<br /> provide bid recommendation to the agency, oversee the construction and close out the project.
<br /> (11 TITLE AND LOCATION IClty and State) 121 YEAR COMPLETED
<br /> Vista Park PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> (Weston, FL) 2004 2005
<br /> (31 BRIEF DESCRIPTION (Bnel scope, Size, cosl, etc.) AND SPECIFIC ROLE --1 Check If project performed with current firm
<br /> A 30 acres community active parks with four baseball/softball and four football/soccer fields, concession stand, restrooms,
<br />b. sports lighting and parking. The fields were designed with a complete under-drain system allowing quick recovery of the ball
<br /> fields after a rain event. A lift station was required for the restroom and concession stand and the design of the water and
<br /> sewer system was coordinated with the City Sunrise, the utility provider. The complete plans and specification was permitted
<br /> through various agencies, bid, award recommendation was made to the City Commission. Supervision of the construction
<br /> oversight and project close-out.
<br /> (1) TITLE AND LOCATION IClty and Slale) 121 YEAR COMPLETED
<br /> Library Park PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> (Weston, FL) 2006 2007
<br /> (31 BRIEF DESCRIPTION (Bnel scope Size, cosl, etc.) AND SPECIFIC ROLE -.J Check If project pertorrned With current fjrm
<br />c. The work consisted of construction of a six acre park site that sits adjacent to the community library including an Artistic
<br /> fountain area, three pavilions, history walkway, author plaques, open activity area, restroom building, and water, sewer and
<br /> storm drainage improvements. The complete plans and specification was permitted through various agencies, bid, award
<br /> recommendation was made to the City Commission.
<br /> (1) TITLE AND LOCATION (Clly and State! 12 YEAR COMPLETED
<br /> Bonaventure Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (II applic,1ble)
<br /> (Bonaventure, FL) 2000-2004 2001-2006
<br />d. (3) BRIEF DESCRIPTION (Bnel scope, Size, cosl, etc.) AND SPECIFIC ROLE -.J Check if proiect performed with current firm
<br />Project was designed Bid and constructed in four different Phases and consisted of about 10 miles of roadway improvement
<br /> and Landscape Upgrade including Drainage Retrofit and Upgrade, Roadway Realignment and Median Construction, Landscape
<br /> Design, Sidewalk Reconstruction, Brick Paver Crosswalks and Resurfacing of the Roadways.
<br /> $ 4,500,000 Construction Cost
<br /> (11 TITLE AND LOCATION (Clly and State) 12\ YEAR COMPLETED
<br /> 172nd Avenue Roadway Improvementsl From Collins Ave. to North Bay Road PROFESSIONAL SERVICES I CONSTRUCTION II( applicable)
<br /> (Sunny Isles Beach, FL) 2003-2007 N/A
<br /> 131 BRIEF DESCRIPTION IBnel scooe. size. cost. etc.1 AND SPECIFIC ROLE -.J Check if oroiect oerformed with current finn
<br />e. Project included resurfacing of 1.400 LF of 2 lane road, redesign of entire drainage system with type F curb and gutter, new
<br /> sidewalk and Landscaping. Required coordination with WASD to allow rehabilitation of existing sanitary sewer collection
<br /> system. Under grounding of FPL overhead lines and design of new street lighting. Permitting, bid, bid analysis and award were
<br /> also included in the project scope.