Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />Shahin Hekmat, P. E. <br /> <br />Civil Engineer <br /> <br />15 FIRM NAME AND LOCATION (Cily and Slalel <br />Eisman & Russo, Inc. (Davie, FL) <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.S., Civil Engineering, University of Miami, Coral Gables <br /> <br />17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Professional Engineer, Florida #49941 <br /> <br />18 OTHER PROFESSIONAL QUALIFICATIONS (PublicatIOns Orqanizations. Tr.1lmnq. Awards. elc.) <br />· FES/FICE Leadership Institute - 2006 . Advanced Work Zone Traffic Control <br /> <br />· FES Stormwater Management Design . Florida Engineering Society <br /> <br />· FDEP NPDES Design Course . FICE CLEC <br /> <br />· Nan Society of Professional Engineers <br />· FL Assoc. of Special District Engineers <br />· American Water Works Association <br /> <br />19. RELEVANT PROJECTS <br /> <br /> 11\ TITI F ANn I Or:ATION (r:llv Anrl StAte I I '"' V" AD rmAPI "T"" <br /> Consulting Engineering Services PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> (Various Municipalities in South Florida) 1990-2007 <br /> (3) BRIEF DESCRIPTION (Bnel scope. size. cost, elc.) AND SPECIFIC ROLE -.J Check if proiect performed with current frrm <br /> Served as City Engineer for City of Weston, Consultant Engineer for the City of Sunny Isles Beach and North Lauderdale and <br />a. District Consultant for South Broward Drainage District, Indian Trace Development District, Bonaventure Development District <br /> and North Lauderdale Water Control District. Responsibility included review and approval of all new developments within the <br /> agency boundary, working with staff to identify all improvement projects, prepare preliminary construction cost estimate, and <br /> attend Commission/Board of Supervisors meetings. Supervise the preparation of plans and specifications for all projects, <br /> provide bid recommendation to the agency, oversee the construction and close out the project. <br /> (11 TITLE AND LOCATION IClty and State) 121 YEAR COMPLETED <br /> Vista Park PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> (Weston, FL) 2004 2005 <br /> (31 BRIEF DESCRIPTION (Bnel scope, Size, cosl, etc.) AND SPECIFIC ROLE --1 Check If project performed with current firm <br /> A 30 acres community active parks with four baseball/softball and four football/soccer fields, concession stand, restrooms, <br />b. sports lighting and parking. The fields were designed with a complete under-drain system allowing quick recovery of the ball <br /> fields after a rain event. A lift station was required for the restroom and concession stand and the design of the water and <br /> sewer system was coordinated with the City Sunrise, the utility provider. The complete plans and specification was permitted <br /> through various agencies, bid, award recommendation was made to the City Commission. Supervision of the construction <br /> oversight and project close-out. <br /> (1) TITLE AND LOCATION IClty and Slale) 121 YEAR COMPLETED <br /> Library Park PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) <br /> (Weston, FL) 2006 2007 <br /> (31 BRIEF DESCRIPTION (Bnel scope Size, cosl, etc.) AND SPECIFIC ROLE -.J Check If project pertorrned With current fjrm <br />c. The work consisted of construction of a six acre park site that sits adjacent to the community library including an Artistic <br /> fountain area, three pavilions, history walkway, author plaques, open activity area, restroom building, and water, sewer and <br /> storm drainage improvements. The complete plans and specification was permitted through various agencies, bid, award <br /> recommendation was made to the City Commission. <br /> (1) TITLE AND LOCATION (Clly and State! 12 YEAR COMPLETED <br /> Bonaventure Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (II applic,1ble) <br /> (Bonaventure, FL) 2000-2004 2001-2006 <br />d. (3) BRIEF DESCRIPTION (Bnel scope, Size, cosl, etc.) AND SPECIFIC ROLE -.J Check if proiect performed with current firm <br />Project was designed Bid and constructed in four different Phases and consisted of about 10 miles of roadway improvement <br /> and Landscape Upgrade including Drainage Retrofit and Upgrade, Roadway Realignment and Median Construction, Landscape <br /> Design, Sidewalk Reconstruction, Brick Paver Crosswalks and Resurfacing of the Roadways. <br /> $ 4,500,000 Construction Cost <br /> (11 TITLE AND LOCATION (Clly and State) 12\ YEAR COMPLETED <br /> 172nd Avenue Roadway Improvementsl From Collins Ave. to North Bay Road PROFESSIONAL SERVICES I CONSTRUCTION II( applicable) <br /> (Sunny Isles Beach, FL) 2003-2007 N/A <br /> 131 BRIEF DESCRIPTION IBnel scooe. size. cost. etc.1 AND SPECIFIC ROLE -.J Check if oroiect oerformed with current finn <br />e. Project included resurfacing of 1.400 LF of 2 lane road, redesign of entire drainage system with type F curb and gutter, new <br /> sidewalk and Landscaping. Required coordination with WASD to allow rehabilitation of existing sanitary sewer collection <br /> system. Under grounding of FPL overhead lines and design of new street lighting. Permitting, bid, bid analysis and award were <br /> also included in the project scope. <br /> Under Design <br /> <br />STANDARD FORM 330 (6/2004) PAGE # <br />